TOHATSU BFT115A Service Manual page 51

4 stroke
Hide thumbs Also See for BFT115A:
Table of Contents

Advertisement

TUBE ROUTING
VIEWED FROM THE RIGHT SIDE:
WATER RELIEF TUBE A
·
Install at approximately right
angles to the horizontal line.
·
After installation, check the tube
for twist, bend, etc.
WATER TUBE CLAMP
Set water relief tube A in the clamp of the
larger diameter side and the main wire
harness in the clamp of the smaller diameter
side.
TUBE (7 x 90 mm)
FUEL TUBE JOINT
TUBE (7 x 75 mm)
TUBE CLAMP D25.0
Install at 8 mm (0.3 in) from
the tube end.
4-WAY JOINT
TUBE CLAMP D25.0
Install at 8 mm (0.3 in) from
the tube end.
WATER RELIEF TUBE B
·
Install at 33° from the horizontal
line.
·
After installation, check the tube
for twist, bends, etc.
WATER RELIEF TUBE B
Approx. 33 °
WATER TUBE E
Viewed from the upper side:
WATER RELIEF
TUBE A
TUBE (7 x 75 mm)
Viewed from the upper side:
TUBE CLAMP
D25.0
SERVICE INFORMATION
TUBE CLAMP D10.5
Install the tube clamp as shown.
Approx. 90 °
TUBE CLAMP
D10.5
Lower side
TUBE (7 x 120 mm)
WATER TUBE E
2-35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents