TOHATSU BFT115A Service Manual page 528

4 stroke
Hide thumbs Also See for BFT115A:
Table of Contents

Advertisement

GEAR CASE (STANDARD ROTATION)
Wipe the tapered part (1) of the vertical shaft (2) and
pinion gear (3) with a shop towel and degreasing
cleaning solvent.
Attach the special tool to the end (flywheel boss
installation side) of the vertical shaft as shown.
TOOL:
Vertical shaft holder (4)
Place a shop towel (5) in the gear case (6) as shown to
protect it.
Apply gear oil to the threads and seating surface of the
pinion gear nut (7), and install the pinion gear and
pinion gear nut onto the vertical shaft.
• Before installing the pinion gear, make sure that the
forward bevel gear/taper bearing is positioned in the
gear case correctly.
Holding the vertical shaft using the special tool as
shown, tighten the pinion gear nut to the specified
torque.
TORQUE: 142 N·m (14.5 kgf·m, 105 lbf·ft)
Install the propeller shaft holder (page 16-21).
PROPELLER SHAFT HOLDER
DISASSEMBLY/ASSEMBLY
DISASSEMBLY
Remove the needle bearing (30 x 37 x 26 mm) (1) from
the propeller shaft holder (2) using the special tools.
TOOLS:
Remover handle (3)
Bearing remover, 30 mm (4)
Remover weight (5)
16-34
07SPB-ZW10200
07936-3710100
07936-8890300
07741-0010201
(1)
(7)
(1)
(2)
(4)
(3)
(7)
(2)
(4)
(3)
(2)
(6)
(5)
(5)
(3)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents