TOHATSU BFT115A Service Manual page 509

4 stroke
Hide thumbs Also See for BFT115A:
Table of Contents

Advertisement

Install the lower rubber mount (1) and lower mount
collar (2) while holding the extension case.
• Install the lower mount collar with the smaller
diameter side toward the lower rubber mount.
• Install the lower rubber mount with the "OUT" mark
toward out.
Install the bolt (12 × 225 mm) (3), two washers (4) and
tighten the self-locking nut (5) to the specified torque.
TORQUE: 83 N·m (8.5 kgf·m, 61 lbf·ft)
Install the ground terminal (6) and tighten the bolt (6 ×
12 mm) (7).
Install the lower mount housing (8) and tighten the three
bolts (9).
Install the same parts described above to the opposite
side of the extension case, except the bolt and ground
terminal.
Install the following:
– Gear case (page 16-9)
– L. engine under cover (page 6-6)
– R. engine under cover (page 6-11)
SHIFT ROD REMOVAL/INSTALLATION
REMOVAL
Remove the water pump (page 11-7).
Wrap a shop towel (1) around the shift rod (2) spline,
and use pliers to turn the shift rod in the shown direction
(cutout (3) of the shift rod spline is facing toward the
cruising direction (4)).
GEAR CASE (STANDARD ROTATION)
(7)
(3)
(2)
(1)
(9)
(2)
(3)
(4)
(6)
(4)
(5)
(8)
(1)
16-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents