FUEL SYSTEM
INJECTOR BASE REMOVAL/
INSTALLATION
Remove the intake manifold (page 5-87).
Remove the fuel line assembly (page 5-91).
Installation is in the reverse order or removal.
Tighten the five bolts (8 × 25 mm) and two nuts (8 mm) to the specified
torque in the numbered order in two or three steps.
Tighten the bolt (8 × 35 mm) securely.
PLATE STAY A (part of
vapor separator)
5-98
INJECTOR BASE GASKET
BOLT (8 × 35 mm)
INJECTOR BASE
4
NUT (8 mm) (2)
24 N·m (2.4 kgf·m, 18 lbf·ft)
1
5
BOLT (8 × 25 mm) (5)
24 N·m (2.4 kgf·m, 18 lbf·ft)
2
6
7
3