TOHATSU BFT115A Service Manual page 377

4 stroke
Hide thumbs Also See for BFT115A:
Table of Contents

Advertisement

ASSEMBLY
Apply liquid sealant (Threebond® 1216 or equivalent) to
the threads of the two sealing bolts (1).
• To prevent leaks, do not install the parts if 5 minutes
or more have elapsed since applying the liquid
gasket. Instead, reapply liquid gasket after removing
the old residue.
• After assembly, wait at least 30 minutes before filling
the engine with oil.
Install and tighten the sealing bolts to the specified
torque.
TORQUE: 49 N·m (5.0 kgf·m, 36 lbf·ft)
Apply locking agent to the threads of the sealing bolt
(1).
Check the relief valve (2) surface for damage.
Apply engine oil to the relief valve and valve spring (3).
Install the relief valve and valve spring, then tighten the
sealing bolt to the specified torque.
TORQUE: 39 N·m (4.0 kgf·m, 29 lbf·ft)
Clean the inner rotor (1) and outer rotor (2) and apply
engine oil.
Apply engine oil to the oil pump body (3) and install the
inner and outer rotor in the same direction as noted
during disassembly.
LUBRICATION SYSTEM
(1)
(1)
(2)
(3)
(1)
(2)
(3)
(1)
12-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents