GEAR CASE (COUNTER ROTATION)
Apply marine grease to the vertical shaft (1) spline area,
vertical shaft bushing (2) inner surface and water tube
seal ling (3).
Install the two dowel pins (4) to the gear case (5).
Install the gear case by aligning the spline cutout (6) of
the shift rod (7) with the spline projection (8) of the shift
rod A (9).
Loosely install the seven bolts (10).
Tilt down the motor to the lowermost position.
Tighten the seven bolts to the specified torque.
TORQUE: 34 N·m (3.5 kgf·m, 25 lbf·ft)
Install the gear case cover (1) by aligning the " " marks
(2).
Install and tighten the bolt (3).
After installing the gear case, adjust the shift control
cable (page 20-16).