After creating the backup, if you press the "Open" button, a screen like the one shown below appears for
the "Turin via Bologna 188/C" site:
Figure 65: site with 2 projects (one of which is backup)
In detail, the project identified with the note "Latest version" indicates the most recent version of the
project.
The project identified with the note "Backup 1" indicates, however, the backup created previously with
respect to the latest changes to the most recent version.
The "Last saved" column shows the date and time of the last save of the project or backup creation
date and time.
98
MT124-032N
Need help?
Do you have a question about the IPerCom 3.1.0 and is the answer not in the manual?
Questions and answers