Continuation Of The Parallel Shift Function - YASKAWA NX100 Operator's Manual

Hide thumbs Also See for NX100:
Table of Contents

Advertisement

6 Convenient Functions
6.2 Parallel Shift Function
6.2.4

Continuation of the Parallel Shift Function

• If the shift function is cancelled through a job editing operation after execution of a parallel shift
instruction, the job must be started again from the beginning.
Because no shift is performed when the operation is restarted, there is a possibility of
interference between the workpiece and fixture.
If any of the following operations are performed after executing a parallel shift instruction, the shift
function is cancelled.
• Job editing operation (changing, deleting, adding)
• Job copy, job name change
• Registering a new job, deleting a job, or modifying a selected job
• Restart after the alarm occurs
• When control power is turned OFF
NOTE
The parallel shift function remains in effect even if the control power supply is turned OFF.
6-13
149235-1CD
210 of 493
RE-CSO-A031

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents