Modification by TRT (Traverse Time)

Modifications made by TRT have the following characteristics:
• By setting the time required to execute a move instruction (moving time) to a desired
value, the speeds can be modified.
• It is possible to measure the moving time without actually moving the manipulator.
For example, when the movement from lines 5 through 20 currently requires 34 seconds, and you want
to reduce it to 15 seconds or extend it to 50 seconds, this function is used.
Operation
1
Select {JOB} under the main
menu.
2
Select {JOB}.
3
Move the cursor to the
instruction area.
4
Press [SHIFT] + [SELECT] in
the weaving time measure
start line.
5
Move the cursor to the end
line.
6
Select {EDIT} under the menu.
7
Select {TRT}.
8
Set the desired items.
The JOB CONTENT window appears.
The line numbers of the selected lines are highlighted.
The TRT window appears.
JOB
EDIT
TRT
START LINE NO.
END LINE NO.
MOVING TIME
SETTING TIME
EXECUTE
Main Menu
Short Cut
START LINE NO.
Displays the first line number of the section to be measured
and modified.
END LINE NO.
Displays the last line number of the section to be measured
and modified.
MOVING TIME
The weaving time needed to move from the first number to last
number is measured and displayed.
SETTING TIME
Set the desired weaving time.
When [SELECT] is pressed when the cursor is on this item, the
input buffer line appears. Input the desired weaving time and
press [ENTER].
3-60
Explanation
DISPLAY
UTILITY
0001
0002
00010.00 sec
00007.00 sec
CANCEL
149235-1CD
124 of 493
RE-CSO-A031

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents