Copyright © New Holland
SECTION 55 - ELECTRICAL SYSTEM
EIC ENGINE PREHEAT
1
The engine preheat is governed automatically by the
EIC based on coolant temperature and engine code.
Preheat is initiated when the ignition key is turned to
the "RUN" position and the cycle time will vary from
0 - 20 seconds.
Turn the ignition key to the "RUN" position, and the
EIC character display, 1, will show seconds
remaining for engine preheat time. The preheat
indicator light, 2, will be lit during the preheat cycle.
The operator should wait until the display zeros "0",
2
the indicator light goes off, and the audible alarm
sounds to start the engine. If the skid steer does not
23
start, re-cycle the engine preheat timer by turning the
ignition key "OFF" then "ON". This will restart the
timed preheat cycle.
55-32