New Holland LS140 Workshop Manual page 25

Hide thumbs Also See for LS140:
Table of Contents

Advertisement

To jack the cab and boom assembly back into
position:
1. Pull the hydrostat control handles forward and
hold in this position with rubber tie straps from the
handle to the front cab post.
2. Jack the cab and boom back into position.
3. Keep the wire harness, 1, and throttle cable, 2, in
position to prevent damage from setting the cab
on them.
4. Pull the wire harness through the loop, 3.
CAUTION
Keep the wire harness from being damaged. A
damaged wire harness could result in damage to
the skid steer electrical components.
5. Remove rubber tie straps from the hydrostatic
control handles.
6. Reinstall all cab support bolts front and rear.
NOTE: Replace any standard 7/8, nuts with 7/8,
locknuts, part #280658.
Torque the rear bolts, 1, to 312 N·m (230 ft. lbs.).
7. Reinstall the parking brake linkage, 2.
8. Position the throttle cable, 3, inside frame.
9. Reinstall the rear fender supports at 1. Do not
tighten hardware at this time.
SECTION 00 - GENERAL INFORMATION
00-24
Copyright © New Holland
32
33
34

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls150

Table of Contents