Op. 10 236 08
FUEL INJECTION TIMING
Spill Timing Procedure (with cylinder head installed)
1. Remove the No. 1 delivery valve holder, 3,
(nearest the radiator), the spring, 2, and delivery
valve, 1.
2. Reinstall the delivery valve holder and spring.
Tighten the holder finger tight.
3. Remove the valve rocker cover.
4. Rotate the crankshaft, 1, to align the pulley timing
mark, 2, with the timing pointer. The crankshaft
must be on the compression stroke, both intake
and exhaust valves closed.
5. Remove the rocker shaft support assembly.
SECTION 10 - ENGINE
10-102
Copyright © New Holland
168
169
170