3. Install the rear ROPS post hardware, 1. Make
sure the wire harness and throttle cable are to the
inside of the post at 2. Tighten the front and rear
retaining hardware at this time.
Tighten the front to: 190 N·m (140 ft. lbs.).
Tighten the rear to: 312 N·m (230 ft. lbs.).
4. Lower the boom to the lowered position and re-
move the lifting chains.
5. Reconnect the auxiliary hydraulic circuit hoses,
1, and boom circuit hoses, 2.
6. Reconnect the bucket circuit hoses, 1, and boom
circuit hoses, 2.
SECTION 39 - FRAMES
39-11
Copyright © New Holland
26
27
28