New Holland LS140 Workshop Manual page 223

Hide thumbs Also See for LS140:
Table of Contents

Advertisement

Sealed Bearing Installation
1. Install the bushing, 1, and sealed bearing, 2, over
the hole in the pintle arm. Install the capscrews,
3, into the pintle arm.
2. Make sure the bearing, 1, sits on top of the bush-
ing, 2, over the pintle arm.
Op 29 130 06
Control Linkage Reassembly and Adjustment
1. Attach the cams, 1, to the pintle arms using me-
dium-strength Loctite #242, and torque the hard-
ware to 55 N·m (40 ft. lbs.).
2. Install the keys into the cam plate shafts, 2.
3. Slide the pintle arm assemblies onto the cam
plate shafts flush or 1/32" below end of shaft. The
cams should be to the engine side of the pintle
shaft. Install 3/8" x 2-1/2" Grade 8 bolts and lock-
nuts, 3; torque to 65 N·m (48 ft. lbs.).
NOTE: If the arms are above the end of the shaft, the
cams may interfere with the neutralizer plate.
4. Connect the control links, 7, to the pintle arms
and install the dampeners. Note there are
spacers between the arm and the dampener at
4. Attach the other end of links to the control lev-
ers at 5. Connect the other end of the dampeners
to the support plates, 6. The right dampener sup-
port is adjustable; position the support to align
the dampener. Tighten the hardware securely.
SECTION 29 - HYDROSTATIC TRANSMISSION
29-78
1
3
2
19990111
19990111
1
2
19990112
Copyright © New Holland
165
166
167

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls150

Table of Contents