4. Place the main wire harness to the front side of
the boom lock linkage at 1, and reinstall the wire
clamps.
5. Route the wire harness to the front of the loader
on the left side and install wire clamps where
previously installed. Place the harness into the
loop (keeper) and secure with a wire tie at 1, and
then along the top of the lower frame to the rear
of the loader to the engine fuse/relay panel area.
6. Route the harness branch to the inside of the
frame with the hydraulic lines and down to the
floor and front of the control valve. Refasten in
the J clamp and route the connectors between
valve bosses and plug in solenoids. Tuck the
connectors between valve bosses to protect the
harness.
7. Connect the main wire harness connector, 1, to
the engine wire harness. Reconnect the wires to
the proper components in the panel, 2.
8. Reconnect the wires to the fuel tank sender, 3.
Route the harness in the groove in the fuel tank
at 4. Reconnect the electric fuel pump power
wires and ground, 5. Reconnect the wires to the
air cleaner restriction switch, 6.
NOTE: Refer to "Removal, Installation and Wiring of
Electrical Components" earlier in this section for
more details of proper wire connections.
SECTION 55 - ELECTRICAL SYSTEM
55-115
2
3
1
5
4