New Holland LS140 Workshop Manual page 242

Hide thumbs Also See for LS140:
Table of Contents

Advertisement

27. Attach the ball end and jam nut, 1, onto rod, 2.
Install spacer, 12, (OD - 7/16"; length - 15/32")
between the ball end and arm, 3. Secure with a
5/16" x 1-3/4" bolt, lock washer, and nut at 4.
28. Install shim washers at 5, between the cotter pin,
6, and bearing, 7, to center rod, 2, in the control
handle tube at 8. Secure the cotter pin and slide
the set collar, 9, against the opposite bearing to
remove any side movement of the shaft and tight-
en the setscrew.
29. Drive the groove pin, 12, in the arm completely
into place.
30. With the handle in the neutral position angle, ad-
just the length of the rod, 2, so the ball stud at the
arm, 3, aligns with the pivot bearings at 10. This
will also set the pivot arm, 11, in a vertical posi-
tion.
31. Rotate the handle to make sure the rod, 2, does
not interfere at the top or bottom of the control
handle tube. Move the control handle back and
forth (forward and reverse) and make sure the
control arm, 3, does not move. When there is no
movement, tighten the jam nuts at both ends of
the rod.
REINSTALLATION
1. Place the handle assembly in the unit, install the
handle mounting bolts, 1, and tighten securely.
2. Install the auxiliary hydraulic control or bucket
control rod, 1, on the right control handle arm, 2.
SECTION 29 - HYDROSTATIC TRANSMISSION
29-97
8
2
10
9
1
2
19996848
Copyright © New Holland
3
4
1
10
11
12
6
5
7
217
218
1
219

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls150

Table of Contents