New Holland LS140 Workshop Manual page 241

Hide thumbs Also See for LS140:
Table of Contents

Advertisement

21. Boom hydraulics control - Attach the handle and
rod assembly, 1, to the control handle, 2, by first
sliding the rod, 3, down through the control han-
dle tube.
22. Boom hydraulics control - Position the handle
support on the tube by aligning the setscrew, 4,
with the drilled hole in the tube. Tighten the set-
screw and locknut.
23. Boom hydraulics control - Insert the spring and
ball at 1. Insert the L-pin, 2, and drive the roll pin,
3, in flush to retain the L-pin.
24. Assemble the pivot shaft, 1, shim washers, 2,
arm, 3, set collar, 4, and bearings, 5, into the con-
trol arm housing. Fasten each bearing with two
5/16" x 3/4" carriage bolts, lock washers, and
nuts at 6.
25. Rotate the pivot shaft, 1, to position the arm up-
ward as shown at 7.
26. Note the position of the arm, 3, on the shaft, 1, in
relation to the arm at 7. Insert groove pin, 8,
through arm, 3, and into shaft, 1, just far enough
to position the arm. Do not hammer into place at
this time.
SECTION 29 - HYDROSTATIC TRANSMISSION
29-96
4
19996890
19997746
3
6
4
5
8
Copyright © New Holland
3
1
2
214
1
2
3
215
5
7
2
1
216

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls150

Table of Contents