New Holland LS140 Workshop Manual page 160

Hide thumbs Also See for LS140:
Table of Contents

Advertisement

5. Remove the right engine side shield to access
the charge check valve and test port.
6. Install the pressure test gauge in the test port at
1.
IMPORTANT: Check the hydraulic oil level and add
if required to insure sufficient oil for the test.
7. Start the engine and run it at full throttle (LS140
at 3070 - 3150 RPM; LS150 at 3410 - 3480 RPM)
and take a pressure reading, 7.5 - 8.2 bar (110 -
120 PSI).
8. Operate the hydrostatic control levers in forward
and reverse until the system bypasses and take
a pressure reading. Return the controls to neu-
tral. The pressure should be 6.8 - 8.2 bar (100 -
120 PSI).
CAUTION
Always stay clear of moving parts during testing
or serious injury could occur.
9. The check valve is not adjustable. Replace the
check valve, 1, if the pressure is not within speci-
fications in step 7. If the pressure is not correct in
step 8, further testing is required, refer to pump
case drain testing.
SECTION 29 - HYDROSTATIC TRANSMISSION
29-15
Copyright © New Holland
13
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls150

Table of Contents