Boom, Upper And Lower Link Reinstallation - New Holland LS140 Workshop Manual

Hide thumbs Also See for LS140:
Table of Contents

Advertisement

SECTION 82 - FRONT LOADER (BOOM AND MOUNTING PLATE)
BOOM, UPPER AND LOWER LINK
REINSTALLATION
1. If the upper and lower boom links and boom cylin-
ders were removed, attach the upper and lower
links to the ROPS before installing the main
boom assembly.
2. Install the lower link pivot pins, 1, through the
links and insert the tapered end of the pin into the
ROPS frame. Install the pin retaining hardware
and tighten, making sure the tapered pin is in-
serted into the ROPS straight.
3. Install the upper link pivot pins through the links
and insert the tapered end of the pin into the
ROPS post at 2. Install the pin retaining hard-
ware, 1, and tighten, making sure the tapered pin
is inserted into the ROPS post straight.
4. Position the main boom assembly over the load-
er ROPS, positioning the boom on the boom
stops.
5. Attach the upper link rear with tapered pivot pins
and retaining hardware at 1. Tighten the hard-
ware, making sure the pin is straight in the main
boom.
82-27
Copyright © New Holland
58
59
60

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls150

Table of Contents