ABB IRB 14000 Product Manual page 213

Hide thumbs Also See for IRB 14000:
Table of Contents

Advertisement

2
3
4
Product manual - IRB 14000
3HAC052983-001 Revision: D
Action
DANGER
Turn off all:
electric power supply
air pressure supply
to the robot, before starting the repair work
on the robot.
Remove the wrist cover. Rotate axis 5
manually so that all screws can be ac-
cessed.
Remove the lower axis-4 cover.
© Copyright 2015 - 2016 ABB. All rights reserved.
4.4.7 Replacing the axis-6 motor
Note
xx1400002760
xx1500000360
Continues on next page
4 Repair
Continued
213

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents