(2) Network range assignment
Monitoring time
*1
LB/LW setting
*1
LX/LY setting
Specify I/O master station
Specify reserved station
Supplementary setting
Station inherent parameters
*1
9 - 48
9.5 PLC side setting when connecting to MELSEC/10
Item
Station No.1
Send range
for
each station
(LB)
Station No.2
Station No.1
Send range
for
each station
(LW)
Station No.2
*1
Be sure to set it to perform the cyclic transmission.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the PLC CPU, operate the PLC CPU ether turning OFF
and then ON or resetting.
Set value
Start
0000H
End
00FFH
Start
0100H
End
01FFH
Start
0000H
End
00FFH
Start
0100H
End
01FFH
No setting
No setting
No setting
(Use default value)
: Necessary
Setting necessity at GOT
200
: As necessary
connection
: Not necessary