Mitsubishi Electric GOT2000 Series Connection Manual page 609

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(2) CC IE Control Utility's [Parameter Settings]
(a)
Parameter settings
Number of modules
Link device refresh cycle
Routing parameter
Target module
Start I/O No.
Channel No.
Network type
*1
Mode
Operation
settings
Network No.
Group No.
Station No.
Refresh parameters
Network range assignment
*1
Set the same mode setting as that of the GOT.
*2
Specify the same network No. as that of the GOT.
Item
*2
Set value
1
(Use default value)
Refer to (c)
1
0000H
151
CC IE Control
(Control station)
Online
1
0
1
(Use default value)
Refer to (b)
: Necessary
: As necessary
10.4 PLC Side Setting
Setting necessity at GOT
connection
10
: Not necessary
10 - 31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents