Sign In
Upload
Manuals
Brands
Mitsubishi Electric Manuals
Computer Hardware
GOT2000 Series
Mitsubishi Electric GOT2000 Series Manuals
Manuals and User Guides for Mitsubishi Electric GOT2000 Series. We have
20
Mitsubishi Electric GOT2000 Series manuals available for free PDF download: Connection Manual, User Manual, Hardware User Manual, Basic Training Textbook, Quick Start Manual
Mitsubishi Electric GOT2000 Series Connection Manual (1224 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 83.73 MB
Table of Contents
14
Introduction
3
Safety Precautions
14
Table of Contents
25
List of Manuals for GT Works3
26
Abbreviations, Generic Terms, Meanings of Icons
31
1. Preparatory Procedures for Monitoring
32
Preparatory Procedures for Monitoring
33
Setting the Communication Interface
34
Setting Connected Equipment (Channel Setting)
43
GOT Ethernet Setting
47
I/F Communication Setting
49
Precautions
50
Writing the Package Data Onto the GOT
51
Checking the Package Data Writing On GOT
52
Option Devices for the Respective Connection
53
Option Unit
54
Installing a Unit On Another Unit (Checking the Unit Installation Position)
58
Connection Cables for the Respective Connection
60
Coaxial Cableconnector Connection Method
62
Terminating Resistors of GOT
66
Setting the RS-232/485 Signal Conversion Adaptor
67
Verifying GOT Recognizes Connected Equipment
69
Checking for Normal Monitoring
74
Confirming the Communication State On the GOT Side (For Ethernet Connection)
76
Confirming the Communication State to Each Station (Station Monitoring Function)
79
Check On GX Developer
82
Check On GX Works2
83
Mitsubishi Electric Plc Connections
85
Device Range That Can Be Set
97
MELSEC Iq-R, Rnmt/Nc/Rt, CR800-D (GT27, GT25 Only)
117
MELSEC Iq-R, Rnmt/Rt, CR800-D (GT21 Only)
123
MELSEC Iq-F
139
MELSEC-Q/QS, Q17Nd/M/Nc/Dr, Crnd-700
142
Melsec-Qna, MELDAS C6 *
143
Melsec-L
147
Melsec-A
149
Melsec-Fx
151
Melsec-Ws
155
Access Range for Monitoring
156
Access Range for Monitoring Stations On Network Systems
168
Access Range for Monitoring When Using Ethernet Connection
169
CC-Link System Access Range for Monitoring
171
Data Link System (MELSECNET/B, (II)) Access Range for Monitoring
172
Access Range for Monitoring When Connecting FXCPU
173
Connection to Remote I/O Station in MELSECNET/H Network System
174
Direct Cpu Connection
176
Connection to the Head Module of CC-Link IE Field Network System
177
How to Monitor Reduntant System
178
MELSEC Iq-R Series
179
Connection to Built-In Ethernet Port CPU
185
Connection to Ethernet Module
191
Connection to CC-Link IE Controller Network
195
Connection to CC-Link IE Field Network
199
Connection to Remote I/O Station in CC-Link IE Field Network
220
Connection to CC-Link (Intelligent Device Station)
222
When Connecting Via the Serial Communication Unit
224
Precautions
225
MELSEC Q Series
230
Connection to Remote I/O Station in MELSECNET/H Network System
233
Direct CPU Connection
240
CC-Link Connection (Intelligent Device Station)
242
CC-Link Connection (Via G4)
244
MELSECNET/H and MELSECNET/10 Connections (Network Systems)
245
CC-Link IE Controller Network Connection (Network System)
246
Ethernet Connection
247
Connection to the Redundant Type Extension Base Unit
251
Switch the Monitor Target to the Control System Using the Script Function
263
Precautions
265
MELSEC Redundant Setting
267
Ethernet Connection
268
Connectable Model List
274
Ethernet Module
275
System Configuration
279
Connection to Built-In Ethernet Port CPU or C Controller Module
282
Connecting to Display I/F
283
Connection to CC-Link IE Field Network Ethernet Adapter Module
284
Connecting to PERIPHERAL I/F (Built-In Ethernet Port Motion Controller CPU)
285
GOT Side Settings
286
Communication Detail Settings
288
GOT Ethernet Setting
289
Ethernet Setting
293
Routing Parameter Setting
294
PLC Side Setting
295
Connecting to MELSEC Iq-R Series Built-In Ethernet Port CPU (One-To One Connection)
300
Connecting to MELSEC Iq-R Series Built-In Ethernet Port CPU (Multiple Connection)
306
Connecting to Ethernet Module (MELSEC Iq-R Series)
311
Connection to C Controller Module (MELSEC Iq-R Series)
314
Connecting to MELSEC Iq-F Series Built-In Ethernet Port CPU
318
Connecting to MELSEC-Q/L Series Built-In Ethernet Port CPU (One-To-One Connection)
323
Connecting to MELSEC-Q/L Series Built-In Ethernet Port CPU (Multiple Connection)
329
Connecting to Ethernet Module (Q/L Series)
334
Connecting to C Controller Module (Q Series)
339
Connecting to Ethernet Module (Qna Series)
344
Connecting to Ethernet Module (A Series)
349
Connecting to Ethernet Module (FX Series)
355
Connecting to Built-In Ethernet Port FXCPU (FX3GE)
358
Connecting to Display I/F (CNC C70)
361
Connecting to CC-Link IE Field Network Ethernet Adapter Module
365
Connecting to PERIPHERAL I/F (Built-In Ethernet Port Motion Controller CPU)
369
Precautions
375
Direct Connection to Cpu
376
Connectable Model List
381
System Configuration
383
Connecting to LCPU
386
Connecting to Qnacpu
387
Connecting to ACPU
388
Connecting to MELSEC Iq-F Series
394
Connecting to FXCPU
412
Connecting to WSCPU
413
Connecting to the Motion Controller CPU
415
Connection Diagram
417
RS-422 Cable
421
GOT Side Settings
422
Communication Detail Settings
428
PLC Side Setting
429
GX Works2 Settings
430
Precautions
433
Serial Communication Connection
434
Connectable Model List
440
Serial Communication Module/Computer Link Module
441
System Configuration
442
Connecting to QCPU (Q Mode)
443
Connecting to LCPU
444
Connecting to QCPU (A Mode)
445
Connecting to Qnacpu (Qnacpu Type)
448
Connecting to Qnacpu (Qnascpu Type)
451
Connecting to ACPU (Ancpu Type)
453
Connecting to ACPU (Anscpu Type, A0J2HCPU, A2CCPUC)
455
Connection Diagram
457
RS-422 Cable
459
GOT Side Settings
460
Communication Detail Settings
466
PLC Side Setting
467
Connecting Serial Communication Module (MELSEC Iq-R Series)
468
Connecting Serial Communication Module (Q, L Series)
470
Connecting Serial Communication Module (Qna Series)
473
Connecting Computer Link Module
478
Precautions
479
Bus Connection
480
Connectable Model List
486
System Configuration
489
Connecting to Qnacpu or Ancpu
492
Connection to Qnascpu or Anscpu
498
Connection to A0J2HCPU
499
Connection to Motion Controller CPU (A273UCPU, A273UHCPU(-S3), A373UCPU(-S3))
504
Connecting to Motion Controller CPU (A171SCPU(-S3(N)), A171SHCPU(N), A172SHCPU(N A173UHCPU(-S1))
510
GOT Side Settings
511
Communication Detail Settings
517
Precautions
518
Turning the GOT ON
519
Powering OFF or Resetting the PLC
520
When Assigning GOT I/O Signals
521
When Connecting to a Qna(S)Cpu or An(S)Cpu Type
522
When Connecting Multiple Gots
523
When Using a PLC CPU in the Direct Mode
524
When Monitoring the Q170MCPU, Q170MSCPU(-S1)
525
Melsecnet/H Connection (Plc to Plc Network)
526
Connectable Model List
533
MELSECNET/H Network Module
534
System Configuration
536
Connecting to the Coaxial Bus System
538
GOT Side Settings
539
Communication Detail Settings
541
Routing Parameter Setting
542
PLC Side Setting When Connecting to MELSECNET/H
543
Switch Setting of MELSECNET/H Network Module
544
Parameter Setting
550
Controller Setting] of GT Designer3
551
PLC Side Setting When Connecting to MELSEC/10
560
Connecting to MELSECNET/10 Network Module (Qna Series)
568
Connecting to MELSECNET/10 Network Module (A Series)
575
Precautions
579
CC-Link IE CONTROLLER NETWORK CONNECTION
580
Connectable Model List
581
Connectable Model List
586
CC-Link IE Controller Network Communication Unit
587
System Configuration
588
GOT Side Settings
589
Communication Detail Settings
592
Routing Parameter Setting
593
PLC Side Setting
598
Connecting to C Controller Module (MELSEC Iq-R Series)
604
Connecting to MELSEC-Q/L Series
615
Precautions
617
CC-Link IE FIELD NETWORK CONNECTION
618
Plc/Motion Controller CPU
623
CC-Link IE Field Network Communication Unit
624
Connecting to CC-Link IE Field Network Communication Unit
633
Connection to C Controller Module (MELSEC Iq-R Series)
635
Connecting to MELSEC-Q/L Series
640
Precautions
643
CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
644
Connectable Model List
650
CC-Link Module
651
System Configuration
652
Connecting with CC-Link Ver.2 Compatible
653
Connecting with CC-Link Ver.1/Ver.2 Compatibles Mixed
654
GOT Side Settings
655
Communication Detail Settings
658
PLC Side Setting
659
Connecting to CC-Link Module (MELSEC Iq-R Series) with Ver.1 Compatible
662
Connecting to CC-Link Module (MELSEC Iq-R Series) with Ver.2 Compatible
665
Connecting to CC-Link Module (MELSEC Iq-R Series) with Ver.1/Ver.2 Compatibles Mixed
668
Connection to C Controller Module (MELSEC Iq-R Series)
671
Connecting to CC-Link Module (Q Series) with Ver.1 Compatible
677
Connecting to CC-Link Module (Q Series) with Ver.2 Compatible
683
Connecting to CC-Link Module (Q Series) with Ver.1/Ver.2 Compatibles Mixed
690
Connecting to MELSEC-L Series with CC-Link Ver.1 Compatible
693
Connecting to MELSEC-L Series with CC-Link Ver.2 Compatible
696
Connecting to CC-Link Module (Qna Series)
704
Connecting to CC-Link Module (A Series)
713
Connecting to CC-Link Module (MELSEC Iq-F Series, MELSEC-FX) with Ver.1/Ver.2 Compatibles Mixed
720
Connecting to CC-Link Module (MELSEC Iq-F Series) with Ver.1/Ver.2 Compatibles Mixed
723
Precautions
727
CC-Link CONNECTION (Via G4)
728
Connectable Model List
733
CC-Link Module/Peripheral Module
734
System Configuration
736
Connecting to LCPU
738
Connection Diagram
739
RS-422 Cable
740
GOT Side Settings
741
Communication Detail Settings
744
PLC Side Settings
746
Connecting AJ65BT-R2N
748
Switch Setting of CC-Link Module (Q Series)
749
Network Parameter] of GX Developer
751
Parameter Setting (When Connecting to C Controller Module (Q Series))
753
Controller Setting] of GT Designer3
754
Precautions
758
Connectable Model List
759
System Configuration
762
Connecting to FREQROL-E500/S500/S500E/F500J/D700/F700PJ
764
Connecting to Freqrol-E700/Sensorless Servo (FREQROL-E700EX)
767
Connecting to FREQROL-A700/F700/700P/A800/F800/A800 Plus
773
Connection Diagram
782
GOT Side Settings
785
FREQROL Series Inverter Side Settings
800
Station Number Setting
801
Precautions
802
Ethernet Connection
803
GOT Side Settings
807
Inverter Side Settings
809
Precautions
810
Device Range That Can Be Set
824
Connectable Model List
825
System Configuration
827
Connecting to the MELSERVO-J2M Series
829
Connecting to the MELSERVO-J4, J3 Series
834
Connecting to the MELSERVO-JE Series
836
Connection Diagram
837
RS-422 Cable
841
GOT Side Settings
843
When Connecting the GOT and Servo Amplifiers Through a Motion Controller or Simple Motion Module
844
Setting On Servo Amplifier Side
845
Connecting to the MELSERVO-J2M Series
846
Connecting to the MELSERVO-J4,J3, JE-□A Series
847
Station Number Setting
848
Device Range That Can Be Set
916
When Connecting the GOT and Servo Amplifiers Through a Motion Controller or Simple Motion Module
917
Precautions
920
Connectable Model List
921
GOT Side Settings
922
Communication Detail Settings
923
Ethernet Setting
924
Robot Controller Side Settings
926
Connecting to Robot Controller (Crnd-700)
929
MELSEC Iq-R, Rnmt/Nc/Rt, CR800-D (GT27, GT25 Only)
929
MELSEC Iq-R, Rnmt/Rt, CR800-D (GT21 Only)
929
MELSEC-Q/QS, Q17Nd/M/Nc/Dr, Crnd-700
929
Device Range That Can Be Set
931
Connectable Model List
932
Connectable Model List
933
System Configuration
934
MELSECNET/10 Connection (PLC to PLC Network)
935
CC-Link Connection (Intelligent Device Station)
936
Ethernet Connection
937
Connection Diagram
938
GOT Side Settings
939
Communication Detail Settings
942
GOT Side Settings
944
GOT Ethernet Setting
945
Ethernet Setting
946
CNC Side Settings
949
CC-Link(ID) Connection to MELDAS C6/C64
952
CC-Link(ID) Connection to M700VS/M70V Series
954
Melsec-Qna, MELDAS C6
954
Device Range That Can Be Set
955
CC-Link (ID) Connection
956
Ethernet Connection
958
Connectable Model List
959
Connection Diagram
960
GOT Side Settings
961
Communication Detail Settings
962
Laser Displacement Sensor MH11 Side Settings
966
CPU That Can Be Monitored
967
Connectable Model List
978
Melsec-L
984
Melsec-A
985
System Configuration
986
Connection Diagram
991
GOT Side Settings
992
Communication Detail Settings
993
Setting of Serial Multi-Drop Connection Unit
994
Setting Communication Interface (Controller Setting)
999
Setting Switches
1000
Precautions
1004
Connecting the GOT to PLC Via RS-232 Interface
1007
Connecting the GOT to PLC Via RS-422 Interface
1012
RS-422 Cable
1018
Melsec-Fx
1026
What Is Multi-Channel Function?
1028
System Configuration
1029
Ethernet Multiple Connection
1030
GOT Side Settings
1032
General Flow From System Selection to Drawing
1033
Determining the Connection Type and Channel No. (System Selection)
1038
Determining the GOT Side Interface (Interface Selection)
1045
Setting for Communication Settings
1048
Items to Be Checked before Starting Drawing
1050
Precautions
1051
Multi-Channel Function Check Sheet
1058
FA Transparent Function
1059
Compatible Software
1070
List of Models That Can Be Monitored
1094
System Configuration
1100
PX Developer, GX Configurator
1101
MT Developer, MT Works2
1104
MR Configurator, MR Configurator2
1106
FR Configurator
1107
FX Configurator-Fp, FX3U-ENET-L Configuration Tool
1108
RT Toolbox2, RT Toolbox3
1109
NC Configurator2
1110
Connection Diagram
1111
GOT Side Settings
1115
Personal Computer Side Setting
1139
Accessing By CW Configurator
1141
Accessing the PLC By the PX Developer, GX Configurator
1148
Accessing By GX Works2
1171
Accessing By GX Logviewer
1172
Accessing PLC By GX Configurator-Qp
1174
Accessing By the MT Developer
1176
Accessing By the MT Works2
1181
Accessing the Servo Amplifier By the MR Configurator
1182
Accessing the Inverter By the FR Configurator
1183
Accessing PLC By FX Configurator-Fp
1184
Accessing By FX3U-ENET-L Configuration Tool
1185
Accessing By RT Toolbox3
1195
Accessing By RT Toolbox2
1199
Accessing By NC Configurator2
1200
Accessing By MELSOFT Navigator
1201
Accessing By CPU Module Logging Configuration Tool
1202
Accessing By Setting/ Monitoring Tool for C Controller Module
1206
Accessing By MX Component (MX Sheet)
1212
Precautions
1216
When Using GX Works3, GX Works2
1218
When Using MT Developer, MT Works2
1219
Melsec-Ws
Advertisement
Mitsubishi Electric GOT2000 Series User Manual (634 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 21.03 MB
Table of Contents
3
Safety Precautions
13
Table of Contents
23
List of Manuals for GT Works3
24
Abbreviations, Generic Terms, the Meaning of the Icon
33
1 Utility Function
33
Utility Execution
34
Utility Function List
38
Utility Display
40
Display Operation of Main Menu
43
Utility Basic Configuration
44
Basic Operation of Settings Change
45
2 Got Basic Setting
46
Display
46
Display Setting
48
Display Operation of Display
49
Display Setting Operations
53
Language
53
Language Setting
53
Display Operation of Language Display
54
Setting Operation of Language
55
Unique Information
55
Unique Information Setting
55
Display Operation of Unique Information
56
Setting Procedure for Unique Information
57
IP Address
57
IP Address Setting
58
Display Operation of IP Address
59
Setting Procedure for the IP Address
62
Precautions
63
IP Filter Setting
64
Display Operation of the IP Filter Setting
65
Setting Procedure for the IP Filter
67
Operation
67
Operation Setting
68
Display Operation of Operation
69
Setting Operation of Operation
70
Utility Call Key
70
Utility Call Key Setting
70
Display Operation of the Utility Call Key Setting
71
Utility Call Key Setting Operation
73
USB Host
73
USB Host Setting
73
Display Operation of the USB Host Setting
74
Setting Operation of USB Host
76
Time
76
Clock Synchronization Method
77
Time Setting
79
Adjusting the Clock
85
Broadcasting the Clock Data
90
Local Time
93
Controller
93
Controller Setting
94
Communication Detail Setting Display Operation
95
Controller Contents
98
Controller Setting Operation
105
Communication Detail Setting
107
Display Contents of Communication Detail Setting
111
Ethernet Communication
111
Ethernet Setting
111
Display Operation of the Ethernet Setting
112
Display Contents of Ethernet Setting
116
Transparent Mode
116
Transparent Mode Setting
116
Display Operation of the Transparent Mode Setting
117
Operation the Transparent Mode
118
GOT Internal Device Monitor
118
GOT Internal Device Monitor Setting
118
Display Operation of the GOT Internal Device Monitor
118
Got Basic Setting
119
Setting Procedure for the GOT Internal Device Monitor
120
Security
120
Security Level Authentication
122
Operator Authentication
122
Operator Management
137
Password Change
140
Function Setting
Mitsubishi Electric GOT2000 Series User Manual (654 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 10.96 MB
Table of Contents
3
Safety Precautions
14
Table of Contents
24
List of Manuals for GT Works3
25
Abbreviations, Generic Terms, Meanings of Icons
31
1 Fundamentals of Monitor
31
Each Function and Related Manuals
33
System Applications (Extended Functions) Required for Each Function
34
Languages Available for Each Function
35
2 System Launcher
35
Features
35
Specifications
35
System Configuration
37
Precautions
38
Operations for Display
40
Operating Procedure
40
System Configuration Screen
42
Online Module Change Screen
45
3 Device Monitor
45
Features
48
Specifications
48
System Configuration
51
Devices That Can Be Monitored
53
Batch Monitor
56
Test Operation
58
Access Range
58
Precautions
58
Operations Common to the Monitor Screens
59
Displaying the Monitor Screen
61
Names of Each Section of Monitor Screen
62
Display Format of the Monitor Screen ([One Large Screen], [4 Screens])
63
Destination Path Setting ([Connect])
66
Entering Devices ([Register])
68
Deleting a Device ([Delete])
69
Deleting Devices at a Time ([Delete All])
70
Test Operation for the Monitor Device ([Test])
74
Switching the Display (Number or Columns, Comment Display) ([Layout])
75
Monitoring Local Devices ([Local Monitor])
77
File Switching for Comment Display ([Change Comment])
78
Screen Transition (Common Operation)
80
Entry Monitor
82
Batch Monitor
84
TC Monitor (Monitoring Timers and Counters)
86
BM Monitor (Monitoring Buffer Memory)
88
Error Messages and Corrective Actions
89
4 Sequence Program Monitor (Ladder, R Ladder)
89
Features
92
Specifications
92
System Configuration
94
Devices and Range That Can Be Monitored
96
Access Range
96
Precautions
98
Display Operation
103
Setting Ladder Data Storage Location
103
Reading Comment Files From Data Storage (Supported By the Sequence Program Monitor (Ladder) Only)
106
Program Update Check
107
Setting the Security
109
Setting Display Format
109
Switching Languages of Sequence Programs (Supported By the Sequence Program Monitor (Ladder) Only)
109
Switching Comment Display Mode
110
How to Operate PLC Read Screen
110
Displayed Contents
112
Key Functions
114
How to Operate Ladder Monitor Screen
115
Displayed Contents
116
Key Functions
117
Menus
122
How to Operate Ladder Editor Screen
128
Key Functions
128
Menus
136
Find/Replace Operation
136
Device/Contact/Coil Search
138
Factor Search
140
Replace Device (Supported By the Sequence Program Monitor (Ladder) Only)
141
Change Open/Close Cantact (Supported By the Sequence Program Monitor (Ladder) Only)
142
Test Operation
142
How to Operate Device Test Window
144
Error Messages and Corrective Action
Advertisement
Mitsubishi Electric GOT2000 Series User Manual (608 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 20.06 MB
Table of Contents
3
Safety Precautions
14
Table of Contents
23
List of Manuals for GT Works3
24
Abbreviations, Generic Terms, Meanings of Icons
31
1 Utility Function
31
Utility Execution
32
Utility Function List
36
Utility Display
38
Display Operation of Main Menu
38
Got Basic Setting
41
Utility Basic Configuration
42
Basic Operation of Settings Change
43
2 Got Basic Setting
44
Display
44
Display Setting
46
Display Operation of Display
47
Display Setting Operations
51
Language
51
Language Setting
51
Display Operation of Language Display
52
Setting Operation of Language
53
Unique Information
53
Unique Information Setting
53
Display Operation of Unique Information
54
Setting Procedure for Unique Information
55
IP Address
55
IP Address Setting
56
Display Operation of IP Address
57
Setting Procedure for the IP Address
59
Precautions
60
IP Filter Setting
61
IP Filter Setting
61
Display Operation of the IP Filter Setting
62
Setting Procedure for the IP Filter
64
Operation
64
Operation Setting
65
Display Operation of Operation
66
Setting Operation of Operation
67
Utility Call Key
67
Utility Call Key Setting
67
Display Operation of the Utility Call Key Setting
68
Utility Call Key Setting Operation
70
USB Host
70
USB Host Setting
70
Display Operation of the USB Host Setting
71
Setting Operation of USB Host
73
Time
73
Clock Synchronization Method
74
Time Setting
76
Adjusting the Clock
82
Broadcasting the Clock Data
87
Local Time
90
Controller
90
Controller Setting
91
Communication Detail Setting Display Operation
92
Controller Contents
95
Controller Setting Operation
102
Communication Detail Setting
104
Display Contents of Communication Detail Setting
108
Ethernet Communication
108
Ethernet Setting
108
Display Operation of the Ethernet Setting
109
Display Contents of Ethernet Setting
113
Transparent Mode
113
Transparent Mode Setting
113
Display Operation of the Transparent Mode Setting
114
Operation the Transparent Mode
115
Security
115
Security Level Authentication
117
Operator Authentication
117
Operator Management
132
Password Change
135
Function Setting
Mitsubishi Electric GOT2000 Series Connection Manual (582 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 20.13 MB
Table of Contents
14
Introduction
3
Safety Precautions
14
Table of Contents
23
List of Manuals for GT Works3
24
Abbreviations, Generic Terms, the Meaning of the Icon
29
1 Preparatory Procedures for Monitoring
31
Setting the Communication Interface
31
1Setting Connected Equipment (Channel Setting)
40
2GOT Ethernet Setting
44
F Communication Setting
46
4Precautions
47
Writing the Project Data Onto the GOT
47
1Writing the Project Data and OS Onto the GOT
48
2Checking the Project Data and OS Writing On GOT
49
Option Devices for the Respective Connection
49
1Communication Module
50
2Option Unit
50
3Conversion Cables
50
4Serial Multi-Drop Connection Unit
50
5Field Network Adapter Unit
50
6RS-232/485 Signal Conversion Adapter
51
7Installing a Unit On Another Unit (Checking the Unit Installation Position)
55
Connection Cables for the Respective Connection
55
1GOT Connector Specifications
57
2Coaxial Cableconnector Connection Method
59
3Terminating Resistors of GOT
63
4Setting the RS-232/485 Signal Conversion Adaptor
64
Verifying GOT Recognizes Connected Equipment
66
Checking for Normal Monitoring
66
1Check On the GOT
69
2Confirming the Communication State On the GOT Side (For Ethernet Connection)
71
3Confirming the Communication State to Each Station (Station Monitoring Function)
75
Connections to Non-Mitsubishi Electric Products
77
Controller
77
2 Connection to Iai Robot Controller
78
Connectable Model List
79
System Configuration
79
1System Configuration for Connecting to X-SEL, SSEL, ASEL, PSEL
81
System Configuration for Connecting to PCON, ACON, SCON, ERC2
93
Connection Diagram
96
RS-422/485 Cable
102
GOT Side Settings
103
2Communication Detail Settings
104
Robot Controller Side Setting
106
Connecting to SSEL, ASEL, PSEL
107
3Connecting to PCON, ACON, SCON
107
4Connecting to ERC2
108
5Station No.settings
109
Device Range That Can Be Set
110
2.6 Device Range That Can Be Set
119
2IAI Robot Controller (IAI PCON, ACON, SCON, ERC2 Controller)
125
Precautions
128
3 Connection to Azbil Control Equipment
128
Connectable Model List
130
System Configuration
130
1Connecting to DMC10
132
Connecting to DMC50
134
Connecting to SDC15, SDC25/26 or SDC35/36
136
4Connecting to SDC20/21
139
5Connecting to SDC30/31
141
6Connecting to SDC40A/40B/40G
144
7Connecting to SDC45/46
146
8Connecting to CMS, MQV, MPC, MVF, RX
146
3.2 System Configuration
148
9Connecting to CMF015, CMF050
151
10Connecting to CML, PBC201-VN2
153
Connecting to AUR350C, AUR450C
155
Connecting to CMC10B
157
Connecting to AHC2001
160
14Connecting to NX Series
161
Connection Diagram
163
Connection Diagram
163
RS-485 Cable
183
GOT Side Settings
184
2Communication Detail Settings
186
Control Equipment Side Setting
187
Connecting to SDC40A/40B/40G
188
4Connecting to SDC20/21, SDC30/31
190
Connecting to DMC50
191
Connecting to CMS, CMF015
192
Connecting to MPC
194
Connecting to AUR350C, AUR450C
195
Connecting to RX
196
Connecting to AHC2001 CPU
197
Station Number Setting
198
Device Range That Can Be Set
199
AZBIL SDC/DMC Series
201
Precautions
204
Connectable Model List
206
Serial Connection
209
System Configuration for Connecting to CQM1H
211
System Configuration for Connecting to CJ1H, CJ1G, CJ1M, CJ2H, or CJ2M
216
System Configuration for Connecting to CP1H, CP1L, or CP1E
219
System Configuration for Connecting to C200HS, C200H, C200HX, C200HG, or C200HE
222
System Configuration for Connecting to CS1H, CS1G, or CS1D
225
System Configuration for Connecting to C1000H or C2000H
226
System Configuration for Connecting to CV500, CV1000, CV2000, or CVM1
227
Connection Diagram
232
GOT Side Settings
234
PLC Side Setting
235
Connecting to CPM2A, CQM1, CQM1H, C200H or RS-232C Adapter
236
Connecting to CJ1, CJ2, CS1, CP1H, CP1L, or CP1E
239
Connecting to CV500/CV1000/CV2000 or CVM1
240
Connecting to Connection Cable
241
Connecting to Rack Type Host Link Unit
246
Connecting to Serial Communication Unit
248
Connecting to Serial Communication Board (CS1W-SCB21(-V1), CS1W-SCB41(-V1))
249
Connecting to RS-422A/485 Option Board
250
Ethernet Connection
252
System Configuration for Connecting to NJ Series
253
GOT Side Settings
258
PLC Side Setting
259
Precautions
260
Device Range That Can Be Set
261
OMRON PLC (SYSMAC CJ1/CJ2/CS1 Series)
Mitsubishi Electric GOT2000 Series Connection Manual (518 pages)
GRAPHIC OPERATION TERMINAL (Non-Mitsubishi Electric Products 2)
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 14.06 MB
Table of Contents
15
Introduction
3
Safety Precautions
15
Table of Contents
23
Manuals for GT Works3
25
Abbreviations, Generic Terms, and Model Icons
31
1. Preparatory Procedures for Monitoring
31
1 Preparatory Procedures for Monitoring
33
Setting the Communication Interface
33
Setting Connected Equipment (Channel Setting)
41
Setting the Communication Interface
44
GOT Ethernet Setting
48
I/F Communication Setting
50
Precautions
51
Writing the Project Data Onto the GOT
51
Writing the Project Data and OS Onto the GOT
52
Checking the Project Data and OS Writing On GOT
53
Option Devices for the Respective Connection
53
Communication Module
55
Option Unit
55
Conversion Cable
55
Serial Multi-Drop Connection Unit
55
Field Network Adapter Unit
55
RS-232/485 Signal Conversion Adapter
56
Precautions for Installing Units On Another Unit
59
Connection Cables for the Respective Connection
59
GOT Connector Specifications
61
Coaxial Cableconnector Connection Method
63
Terminating Resistors of GOT
68
Setting the RS-232/485 Signal Conversion Adaptor
69
Verifying GOT Recognizes Connected Equipment
71
Checking for Normal Monitoring
71
Check On the GOT
74
Confirming the Communication State On the GOT Side (For Ethernet Connection)
76
Confirming the Communication State to Each Station (Station Monitoring Function)
79
Connections to Non-Mitsubishi Electric Products
81
Hitachi Ies Plc
81
2 Connection To Hitachi Ies Plc
82
Connectable Model List
83
System Configuration
84
Connecting to H-200 to 252 Series, H Series Board Type or EH-150 Series
85
Connection Diagram
86
RS-422 Cable
87
GOT Side Settings
88
Communication Detail Settings
90
PLC Side Setting
91
Device Range That Can Be Set
93
HITACHI HIDIC H Series
94
Device Range That Can Be Set
97
System Configuration
97
Connecting to S10V
98
Connecting to S10Mini
100
Connection Diagram
100
GOT Side Settings
100
PLC Side Setting
103
Connecting to Communication Module
110
Connectable Model List
111
Serial Connection
113
Connecting to MICREX-F70
116
Connecting to MICREX-F120S/140S/15[]S
119
System Configuration for Connecting to MICREX-SX SPH
122
Connection Diagram
123
RS-485 Cable
127
GOT Side Settings
128
Communication Detail Settings
130
PLC Side Settings
138
Station Number Setting
139
Ethernet Connection
140
GOT Side Settings
143
PLC Side Setting (MICREX-SX SPH)
146
FUJI MICREX-F Series
147
FUJI MICREX-SX Series
148
Precautions
Mitsubishi Electric GOT2000 Series Connection Manual (480 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 17.58 MB
Table of Contents
14
Introduction
3
Safety Precautions
14
Table of Contents
22
List of Manuals for GT Works3
23
Abbreviations, Generic Terms, the Meaning of the Icon
29
1. Preparatory Procedures for Monitoring
29
1 Preparatory Procedures for Monitoring
31
Setting the Communication Interface
31
1Setting Connected Equipment (Channel Setting)
41
2GOT Ethernet Setting
45
F Communication Setting
46
1.1 Setting the Communication Interface
47
4Precautions
48
Writing the Project Data Onto the GOT
48
1Writing the Project Data and OS Onto the GOT
49
2Checking the Project Data and OS Writing On GOT
50
Option Devices for the Respective Connection
50
1Communication Module
51
2Option Unit
51
3Conversion Cable
51
4Serial Multi-Drop Connection Unit
54
5Field Network Adapter Unit
56
Connection Cables for the Respective Connection
56
1GOT Connector Specifications
58
2Coaxial Cableconnector Connection Method
60
3Terminating Resistors of GOT
64
4Setting the RS-232/485 Signal Conversion Adaptor
65
Verifying GOT Recognizes Connected Equipment
67
Checking for Normal Monitoring
67
1Check On the GOT
69
1.6 Checking for Normal Monitoring
70
2Confirming the Communication State On the GOT Side (For Ethernet Connection)
72
3Confirming the Communication State to Each Station (Station Monitoring Function)
75
Connections to Non-Mitsubishi Electric Products
77
2 Connection to Hitachi Ies Plc
78
Connectable Model List
79
System Configuration
80
Connecting to H-200 to 252 Series, H Series Board Type or EH-150 Series
81
Connection Diagram
82
RS-422 Cable
83
GOT Side Settings
84
Communication Detail Settings
86
PLC Side Setting
87
Device Range That Can Be Set
89
HITACHI HIDIC H Series
90
Device Range That Can Be Set
93
Connecting to S10V
94
Connecting to S10Mini
99
Connecting to Communication Module
106
Connectable Model List
107
Serial Connection
109
Connecting to MICREX-F70
112
Connecting to MICREX-F120S/140S/15[]S
115
System Configuration for Connecting to MICREX-SX SPH
117
Connection Diagram
118
RS-485 Cable
122
GOT Side Settings
123
Communication Detail Settings
125
PLC Side Settings
133
Station Number Setting
134
Ethernet Connection
135
GOT Side Settings
138
PLC Side Setting (MICREX-SX SPH)
140
FUJI MICREX-F Series
141
FUJI MICREX-SX Series
142
Precautions
Mitsubishi Electric GOT2000 Series Hardware User Manual (438 pages)
Graphic Operation Terminal
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 13.85 MB
Table of Contents
3
Safety Precautions
17
Table of Contents
23
Introduction
23
Manuals for GT Works3
25
Abbreviations, Generic Terms, and Model Icons
33
Chapter 1 Overview
33
Got
33
Features
35
CHAPTER 2 System Configuration
35
Overall Configuration
35
Overall Configuration of GT27, GT25-W, GT25-S, GT25-V, GT23, and GT21
36
Overall Configuration of GT25HS-V
37
System Equipment
37
Got
40
CC-Link IE Field Network Communication Unit Set
41
Extension Unit
44
Software
49
Cable
60
Others
61
Chapter 3 Specifications
61
General Specifications
61
Gt27, Gt2510-Wx, Gt2507-W, Gt25-S, Gt25-V
63
Gt2507T-W
64
Gt25Hs-V
65
Gt23
66
Gt21
68
Performance Specifications
68
Gt27
78
Gt2510-Wx, Gt2507-W
82
Gt2507T-W
84
Gt25-S, Gt25-V
92
Gt25Hs-V
96
Gt23
100
Gt21
110
Specifications of Power Supply Section
110
Gt27
111
Gt2510-Wx, Gt2507-W
112
Gt2507T-W
113
Gt25-S, Gt25-V
114
Gt25Hs-V
115
Gt23
116
Gt21
117
Battery Specifications
119
Chapter 4 Part Names and Settings
124
Gt2510-Wx, Gt2507-W
126
Gt2507T-W
128
Gt25-S, Gt25-V
134
Gt25Hs-V
147
Chapter 5 Emc Directive and Low Voltage Directive
147
Overview
147
Conforming Standards in the EMC Directive
148
Conforming Standards in the Low Voltage Directive
149
EMC Directive Requirements
149
Installing the GOT on the Control Panel
150
Installing a Noise Filter (Power Supply Line Filter)
151
System Configuration
156
Connection of Power Cables and Ground Cables
158
Fabricating a Connection Cable
166
Grounding a Cable
167
Low Voltage Directive Requirements
167
Power Supply
167
Control Panel
168
Grounding
168
External Wiring
Mitsubishi Electric GOT2000 Series Connection Manual (410 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 12.78 MB
Table of Contents
10
Introduction
3
Safety Precautions
10
Table of Contents
18
List of Manuals for GT Works3
19
Abbreviations and Generic Terms
23
1 Preparatory Procedures for Monitoring
25
Setting the Communication Interface
25
Setting Connected Equipment (Channel Setting)
30
I/F Communication Setting
32
Precautions
33
Writing the Project Data and OS Onto the GOT
34
Checking the Project Data and OS Writing On GOT
35
Option Devices for the Respective Connection
35
Communication Module
36
Option Unit
36
Conversion Cables
36
Serial Multi-Drop Connection Unit
37
Installing a Unit On Another Unit (Checking the Unit Installation Position)
40
Connection Cables for the Respective Connection
40
GOT Connector Specifications
42
Coaxial Cableconnector Connection Method
44
Terminating Resistors of GOT
45
Verifying GOT Recognizes Connected Equipment
47
Checking for Normal Monitoring
47
Check On the GOT
49
Confirming the Communication State On the GOT Side (For Ethernet Connection)
51
Confirming the Communication State to Each Station (Station Monitoring Function)
53
Connections to Non-Mitsubishi Products
55
2 Connection to Iai Robot Controller
56
Connectable Model List
57
System Configuration
57
System Configuration for Connecting to X-SEL, SSEL, ASEL, PSEL
58
System Configuration for Connecting to PCON, ACON, SCON, ERC2
69
Connection Diagram
69
Cable
69
RS-422/485 Cable
74
GOT Side Settings
74
Setting Communication Interface (Communication Settings)
74
Communication Detail Settings
74
Connecting to X-SEL
77
Connecting to SSEL, ASEL, PSEL
77
Connecting to PCON, ACON, SCON
78
Connecting to ERC2
78
Station No.settings
79
Device Range That Can Be Set
79
IAI Robot Controller (IAI X-Selcontroller)
85
IAI Robot Controller (IAI PCON, ACON, SCON, ERC2 Controller)
91
Precautions
94
3 Connection to Azbil Control Equipment
94
Connectable Model List
96
System Configuration
96
Connecting to DMC10
98
Connecting to DMC50
100
Connecting to SDC15, SDC25/26 or SDC35/36
102
Connecting to SDC20/21
104
Connecting to SDC30/31
106
Connecting to SDC40A/40B/40G
108
Connecting to SDC45/46
110
Connecting to CMS, MQV, MPC, MVF, RX
112
Connecting to CMF015, CMF050
115
Connecting to CML, PBC201-VN2
117
Connecting to AUR350C, AUR450C
118
Connecting to CMC10B
120
Connecting to AHC2001
122
Connecting to NX Series
123
Connection Diagram
123
Cable
125
Cable
125
RS-485 Cable
141
GOT Side Settings
141
Setting Communication Interface (Communication Settings)
142
Communication Detail Settings
143
Control Equipment Side Setting
143
Connecting to DMC10
143
Connecting to SDC40A/40B/40G
143
Connecting to SDC15, SDC25/26 or SDC35/36
144
Connecting to SDC20/21, SDC30/31
144
Connecting to CMC10L
145
Connecting to DMC50
145
Connecting to SDC45/46
145
Connecting to CMS, CMF015
145
Connecting to CML, CMF050
146
Connecting to MPC
147
Connecting to AUR350C, AUR450C
148
Connecting to AHC2001 CPU
150
Device Range That Can Be Set
152
AZBIL SDC/DMC Series
154
Precautions
Mitsubishi Electric GOT2000 Series Connection Manual (452 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 13.09 MB
Table of Contents
14
Introduction
3
Safety Precautions
14
Table of Contents
22
List of Manuals for GT Works3
23
Abbreviations, Generic Terms, Meanings of Icons
29
1. Preparatory Procedures for Monitoring
29
1 Preparatory Procedures for Monitoring
31
Setting the Communication Interface
31
1Setting Connected Equipment (Channel Setting)
35
2GOT Ethernet Setting
39
F Communication Setting
41
4Precautions
42
Writing the Package Data Onto the GOT
43
2Checking the Package Data Writing On GOT
44
Option Devices for the Respective Connection
44
1Communication Module
45
2Option Unit
45
3Conversion Cables
45
4Serial Multi-Drop Connection Unit
48
5Field Network Adapter Unit
50
Connection Cables for the Respective Connection
50
1GOT Connector Specifications
52
2Coaxial Cableconnector Connection Method
54
3Terminating Resistors of GOT
58
Verifying GOT Recognizes Connected Equipment
60
Checking for Normal Monitoring
60
1Check On the GOT
62
2Confirming the Communication State On the GOT Side (For Ethernet Connection)
64
3Confirming the Communication State to Each Station (Station Monitoring Function)
67
4Check On the PLC
69
Microcomputer Connection
69
2 Microcomputer Connection (Serial)
71
2 2. Microcomputer
72
Microcomputer
72
Microcomputer Connection (Serial)
75
System Configuration
75
1For the Microcomputer Connection (Serial)
80
Connection Diagram
81
Connection Diagram
84
RS-422 Cable
86
Device Data Area
87
D Devices
88
Device Data Area
91
R Devices
92
L Devices
93
M Devices
94
SD Devices
98
SM Devices
100
Message Formats
102
List of Commands
105
Formats 1, 2 (GOT-A900 Series Microcomputer Connection)
116
Precautions
117
Formats 3 to 6 (A Compatible 1C Frame)
122
Formats 7 to 10 (Qna Compatible 3C/4C Frame)
129
Formats 11 to 13 (Digital Electronics Corporation's Memory Link Method)
138
Formats 14, 15 (GOT-F900 Series Microcomputer Connection)
152
GOT Side Settings
154
Communication Detail Settings
156
System Configuration Examples
161
Device Range That Can Be Set
162
Precautions
Mitsubishi Electric GOT2000 Series Connection Manual (388 pages)
GRAPHIC OPERATION TERMINAL Microcomputers, MODBUS/Fieldbus Products, Peripherals
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 15.02 MB
Table of Contents
12
Introduction
3
Safety Precautions
12
Table of Contents
19
List of Manuals for GT Works3
20
Abbreviations, Generic Terms, Meanings of Icons
25
Preparatory Procedures
25
1 Preparatory Procedures for Monitoring
27
Setting the Communication Interface
27
Setting Connected Equipment (Channel Setting)
31
I/F Communication Setting
33
Precautions
34
Writing the Package Data Onto the GOT
35
Checking the Package Data Writing On GOT
36
Option Devices for the Respective Connection
36
Communication Module
37
Option Unit
37
Conversion Cables
37
Serial Multi-Drop Connection Unit
37
Field Network Adapter Unit
38
Installing a Unit On Another Unit (Checking the Unit Installation Position)
42
Connection Cables for the Respective Connection
42
GOT Connector Specifications
44
Coaxial Cableconnector Connection Method
45
Terminating Resistors of GOT
47
Verifying GOT Recognizes Connected Equipment
49
Checking for Normal Monitoring
49
Check On the GOT
51
Confirming the Communication State On the GOT Side (For Ethernet Connection)
53
Confirming the Communication State to Each Station (Station Monitoring Function)
55
Check On the PLC
57
Microcomputer Connection
59
Section 3
59
2 Microcomputer Connection (Serial)
60
Microcomputer Connection (Serial)
62
System Configuration
62
For the Microcomputer Connection (Serial)
66
Connection Diagram
66
Cable
68
Cable
70
Device Data Area
71
D Devices
73
Device Data Area
75
R Devices
76
L Devices
77
M Devices
78
SD Devices
82
SM Devices
84
Message Formats
84
Data Format Type and Application
86
List of Commands
89
Formats 1, 2 (GOT-A900 Series Microcomputer Connection)
102
Formats 3 to 6 (A Compatible 1C Frame)
107
Formats 7 to 10 (Qna Compatible 3C/4C Frame)
115
Formats 11 to 13 (Digital Electronics Corporation's Memory Link Method)
124
Formats 14, 15 (GOT-F900 Series Microcomputer Connection)
138
GOT Side Settings
138
Setting Communication Interface (Communication Settings)
139
Communication Detail Settings
140
System Configuration Examples
143
Device Range That Can Be Set
144
Precautions
Mitsubishi Electric GOT2000 Series Connection Manual (420 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Recording Equipment
| Size: 15.09 MB
Table of Contents
12
Introduction
3
Safety Precautions
6
Wiring Precautions
12
Table of Contents
19
List of Manuals for GT Works3
20
Abbreviations, Generic Terms, Meanings of Icons
25
1. Preparatory Procedures for Monitoring
25
1 Preparatory Procedures for Monitoring
27
Setting the Communication Interface
27
1Setting Connected Equipment (Channel Setting)
31
F Communication Setting
33
3Precautions
34
Writing the Package Data Onto the GOT
35
2Checking the Package Data Writing On GOT
36
Option Devices for the Respective Connection
36
1Communication Module
37
2Option Unit
37
3Conversion Cables
37
4Serial Multi-Drop Connection Unit
40
5Field Network Adapter Unit
42
Connection Cables for the Respective Connection
42
1GOT Connector Specifications
44
2Coaxial Cableconnector Connection Method
46
3Terminating Resistors of GOT
50
Verifying GOT Recognizes Connected Equipment
52
Checking for Normal Monitoring
52
1Check On the GOT
54
2Confirming the Communication State On the GOT Side (For Ethernet Connection)
56
3Confirming the Communication State to Each Station (Station Monitoring Function)
59
4Check On the PLC
61
Microcomputer Connection
61
2 Microcomputer Connection (Serial)
63
2 2. Microcomputer
64
Microcomputer
64
Microcomputer Connection (Serial)
67
System Configuration
67
1For the Microcomputer Connection (Serial)
72
Connection Diagram
73
Connection Diagram
76
RS-422 Cable
78
Device Data Area
79
Devices
83
R Devices
84
L Devices
85
M Devices
86
SD Devices
90
6SM Devices
92
Message Formats
92
1Data Format Type and Application
94
2List of Commands
97
Formats 1, 2 (GOT-A900 Series Microcomputer Connection)
109
Formats 3 to 6 (A Compatible 1C Frame)
114
Formats 7 to 10 (Qna Compatible 3C/4C Frame)
121
Formats 11 to 13 (Digital Electronics Corporation's Memory Link Method)
130
Formats 14, 15 (GOT-F900 Series Microcomputer Connection)
144
GOT Side Settings
146
2Communication Detail Settings
148
System Configuration Examples
153
Device Range That Can Be Set
154
Precautions
Mitsubishi Electric GOT2000 Series Connection Manual (386 pages)
Graphic Operation Terminal
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 18.79 MB
Table of Contents
12
Introduction
3
Safety Precautions
12
Table of Contents
20
List of Manuals for GT Works3
21
Abbreviations, Generic Terms, the Meaning of the Icon
25
Preparatory Procedures
25
1 Preparatory Procedures for Monitoring
26
Setting the Communication Interface
26
Option Devices for the Respective Connection
27
Setting the Communication Interface
27
Setting Connected Equipment (Channel Setting)
33
I/F Communication Setting
35
Precautions
36
Writing the Project Data and OS Onto the GOT
37
Checking the Project Data and OS Writing On GOT
38
Option Devices for the Respective Connection
38
Communication Module
39
Option Unit
39
Conversion Cable
39
Serial Multi-Drop Connection Unit
39
Field Network Adapter Unit
40
Installing a Unit On Another Unit (Checking the Unit Installation Position)
44
Connection Cables for the Respective Connection
44
GOT Connector Specifications
46
Coaxial Cableconnector Connection Method
47
Terminating Resistors of GOT
48
Connection Cables for the Respective Connection
49
Verifying GOT Recognizes Connected Equipment
51
Checking for Normal Monitoring
51
Check On the GOT
54
Confirming the Communication State On the GOT Side (For Ethernet Connection)
56
Confirming the Communication State to Each Station (Station Monitoring Function)
59
Connections to Non-Mitsubishi Products
61
Connection to
61
2 Connection To Hitachi Ies Plc
62
Connectable Model List
63
System Configuration
63
Connection to Large-Sized H Series
65
Connecting to H-200 to 252 Series, H Series Board Type or EH-150 Series
67
Connection Diagram
69
GOT Side Settings
71
PLC Side Setting
72
Device Range That Can Be Set
74
HITACHI HIDIC H Series
76
Connectable Model List
77
System Configuration
78
Connecting to S10Mini
79
Connection Diagram
80
GOT Side Settings
81
PLC Side Setting
82
Device Range That Can Be Set
86
Connectable Model List
87
Serial Connection
89
Connecting to MICREX-F70
92
Connecting to MICREX-F120S/140S/15[]S
95
System Configuration for Connecting to MICREX-SX SPH
96
Connection Diagram
99
GOT Side Settings
101
PLC Side Setting
106
Station Number Setting
107
Ethernet Connection
108
GOT Side Settings
110
PLC Side Setting (MICREX-SX SPH)
111
Device Range That Can Be Set
112
FUJI MICREX-F Series
113
Precautions
Mitsubishi Electric GOT2000 Series User Manual (378 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 12.4 MB
Table of Contents
3
Safety Precautions
15
Table of Contents
21
List of Manuals for GT Works3
23
Abbreviations, Generic Terms, the Meaning of the Icon
29
1 Overview
30
Got
30
Features
33
2 System Configuration
34
Overall Configuration
34
Overall Configuration of GT27, GT25-W, GT25-S, GT25-V, and GT21
34
Overall Configuration of GT25HS-V
35
System Equipment
35
Got
38
CC-Link IE Field Network Communication Unit Set
39
Extension Unit
41
Software
42
7 Option
45
Cable
55
Others
57
3 Specifications
58
General Specifications
58
Gt27, Gt25-W, Gt25-S, Gt25-V
59
Gt25Hs-V
60
Gt23
61
Gt21
62
Performance Specifications
62
Gt27
72
Gt25-W
76
Gt25-S, Gt25-V
84
Gt25Hs-V
86
Gt23
90
Gt21
100
Specifications of Power Supply Section
100
Gt27
102
Gt25-W
103
Gt25-S, Gt25-V
104
Gt25Hs-V
105
Gt23
106
Gt21
107
Battery Specifications
109
4 Part Names and Settings
114
Gt25-W
121
Gt25-S, Gt25-V
122
Gt25Hs-V
133
5 Emc Directive and Low Voltage Directive
134
Overview
134
Conforming Standards in the EMC Directive
135
Conforming Standards in the Low Voltage Directive
136
EMC Directive Requirements
136
Installing the GOT On the Control Panel
137
Installing a Noise Filter (Power Supply Line Filter)
138
System Configuration
143
Connection of Power Cables and Ground Cables
144
Fabricating a Connection Cable
145
Bus Connection
150
Grounding a Cable
151
Low Voltage Directive Requirements
151
Power Supply
151
Control Panel
152
Grounding
152
External Wiring
Mitsubishi Electric GOT2000 Series Connection Manual (322 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Graphics Tablet
| Size: 6.72 MB
Table of Contents
3
Safety Precautions
10
Table of Contents
16
List of Manuals for GT Works3
17
Abbreviations and Generic Terms
21
1 Preparatory Procedures for Monitoring
23
Setting the Communication Interface
23
Setting Connected Equipment (Channel Setting)
27
I/F Communication Setting
29
Precautions
30
Writing the Package Data Onto the GOT
31
Checking the Package Data Writing On GOT
32
Option Devices for the Respective Connection
32
Communication Module
33
Option Unit
33
Conversion Cables
33
Serial Multi-Drop Connection Unit
34
Installing a Unit On Another Unit (Checking the Unit Installation Position)
37
Connection Cables for the Respective Connection
37
GOT Connector Specifications
38
Coaxial Cableconnector Connection Method
39
Terminating Resistors of GOT
40
Verifying GOT Recognizes Connected Equipment
42
Checking for Normal Monitoring
42
Check On the GOT
44
Confirming the Communication State On the GOT Side (For Ethernet Connection)
46
Confirming the Communication State to Each Station (Station Monitoring Function)
48
Check On the PLC
49
Microcomputer Connection
51
2 Microcomputer Connection (Serial)
52
Microcomputer Connection (Serial)
54
System Configuration
54
For the Microcomputer Connection (Serial)
55
Connection Diagram
55
Cable
56
Device Data Area
57
D Devices
61
R Devices
62
L Devices
63
M Devices
64
SD Devices
67
SM Devices
69
Message Formats
69
Data Format Type and Application
71
List of Commands
74
Formats 1, 2 (GOT-A900 Series Microcomputer Connection)
87
Formats 3 to 6 (A Compatible 1C Frame)
92
Formats 7 to 10 (Qna Compatible 3C/4C Frame)
100
Formats 11 to 13 (Digital Electronics Corporation's Memory Link Method)
109
Formats 14, 15 (GOT-F900 Series Microcomputer Connection)
123
GOT Side Settings
123
Setting Communication Interface (Communication Settings)
123
Communication Detail Settings
125
System Configuration Examples
128
Device Range That Can Be Set
129
Precautions
Mitsubishi Electric GOT2000 Series User Manual (288 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 8.55 MB
Table of Contents
3
Safety Precautions
13
Table of Contents
17
List of Manuals for GT Works3
18
Abbreviations, Generic Terms, the Meaning of the Icon
23
1 Overview
23
Features
24
Features
24
Got
27
2 System Configuration
28
Overall Configuration
29
System Equipment
29
Got
32
CC-Link IE Field Network Communication Unit Set
33
Extension Unit
35
Software
36
Option
39
Cable
49
Others
51
3 Specifications
52
General Specifications
52
Gt27, Gt25
53
Gt23
54
Gt21
56
Performance Specifications
56
Gt27
66
Gt25
72
Gt23
76
Gt21
86
Specifications of Power Supply Section
86
Gt27
88
Gt25
89
Gt23
91
Gt21
92
Battery Specifications
93
4 Part Names and Settings
109
5 Emc Directive and Low Voltage Directive
110
Overview
110
Conforming Standards in the EMC Directive
111
Conforming Standards in the Low Voltage Directive
112
EMC Directive Requirements
112
Installing the GOT On the Control Panel
113
Installing a Noise Filter (Power Supply Line Filter)
114
System Configuration
119
Connection of Power Cables and Ground Cables
120
Fabricating a Connection Cable
121
Bus Connection
126
Grounding a Cable
127
Low Voltage Directive Requirements
127
Power Supply
127
Control Panel
128
Grounding
128
External Wiring
Mitsubishi Electric GOT2000 Series User Manual (226 pages)
GRAPHIC OPERATION TERMINAL
Brand:
Mitsubishi Electric
| Category:
Monitor
| Size: 6.59 MB
Table of Contents
3
Safety Precautions
5
Mounting Precautions
6
Wiring Precautions
12
Table of Contents
15
List of Manuals for GT Works3
16
Abbreviations, Generic Terms, the Meaning of the Icon
21
1 Overview
22
Got
22
Features
25
2 System Configuration
26
Overall Configuration
26
How to Read the Model Name
26
GOT Model Name
27
Option Model Name
29
System Equipment
29
Got
31
CC-Link IE Field Network Communication Unit Set
32
Extension Unit
34
Software
35
Option
37
Cable
48
Others
49
3 Specifications
49
General Specifications
50
General Specifications
50
Gt27,Gt25
51
Gt23
52
Gt21
53
Performance Specifications
53
Gt27
63
Gt25
69
Gt23
73
Gt21
77
Specifications of Power Supply Section
77
Gt27
79
Gt25
80
Gt23
82
Gt21
83
Battery Life
83
Battery Specifications
85
4 Part Names and Settings
86
Gt27, Gt25
95
5 Emc Directive and Low Voltage Directive
96
Overview
96
Conforming Standards in the EMC Directive
97
Conforming Standards in the Low Voltage Directive
98
EMC Directive Requirements
98
Installing the GOT On the Control Panel
99
Installing a Noise Filter (Power Supply Line Filter)
100
System Configuration
105
Connection of Power Cables and Ground Cables
106
Fabricating a Connection Cable
106
Ethernet Connection
112
Grounding a Cable
113
Low Voltage Directive Requirements
113
Power Supply
113
Control Panel
114
Grounding
114
External Wiring
114
External Controllers
Mitsubishi Electric GOT2000 Series Basic Training Textbook (255 pages)
Graphic Operation Terminal
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 13.43 MB
Table of Contents
3
Safety Precautions
5
Revisions
7
Table of Contents
10
Introduction
11
Copyright Notice
11
Relevant Manuals
12
System Configuration in this Textbook
13
1 What Is the GOT
13
About the GOT
14
Procedures for Monitoring the PLC CPU by GOT
15
GOT2000 Series Features
16
GOT Function List
22
Equipment Required for Using GOT
30
Applicable Connection Type between the GOT and the PLC CPU
33
Connection to Equipment Other than the PLC
34
Multi-Channel Function
35
2 GOT Operation
35
Summary of Operation
39
3 About GT Designer3
40
GT Designer3 Screen Configuration and Features
40
Screen Layout of GT Designer3
42
Features of GT Designer3
47
How to Use Help
47
Displaying Help
47
Using Help
49
4 From GOT Screen Creation up to the Test
49
Preparation before Using the GOT
50
Screen Creation
50
Project Creation
56
Communication Settings
59
Screen Switching Device Settings
66
Reading Screens
69
Data Transfer (Personal Computer to GOT)
69
Connection from a Personal Computer to GOT
70
About Data Types Transferred to the GOT
71
Communication Settings
72
Writing the Package Data
76
Connection to PLC CPU (Ethernet Connection)
76
Connecting the Cable
77
Checking Whether Data Has Been Properly Transferred to the GOT
77
System Alarm
78
Executing the Monitor
83
5 Drawing Fundamentals
83
Switching the Screen to be Displayed
83
The Screen Type
84
Screen Switching Device
87
Base Screen Switching with the Sequence Program
88
Base Screen Switching with the Touch Switch
89
Window Screen Display and Switching
91
Before Creating the Screen
91
Operations before Creating the Screen
111
Text Settings
115
Numerical Input/Numerical Display Settings
118
Numerical Display Settings
119
Key Window
121
Settings of Lamps
124
Touch Switch Settings
124
Bit Switch Settings
130
Bit Switch Actions
131
Operation Check 1
133
Comment Display Settings
134
About the Comment Display
135
Comment Display Settings by Bit Device
141
Window Screen Creation
145
System Alarm Settings
149
Go to Screen Switch Setting
152
Operation Check 2
155
Training Device List and Sequence Program
156
How to Check the Devices Used in the Created Project
Mitsubishi Electric GOT2000 Series Quick Start Manual (76 pages)
Mitsubishi Graphic Operation Terminal
Brand:
Mitsubishi Electric
| Category:
Computer Hardware
| Size: 14.66 MB
Table of Contents
3
Safety Precautions
4
Table of Contents
6
Features of the Got
7
High-Speed Processing
7
Increased Memory Capacity
7
Multi-Touch Gesture Function
7
Clear Text and Parts
7
Enhanced Lineup
8
Got's Appearance and Enhanced Interface
9
FEATURES of GT Designer3
10
SCREEN LAYOUT of GT Designer3
11
SCREENS THAT CAN BE CREATED with GT Designer3
12
Preparing Required Devices
12
Devices Required to Operate the Got
13
Step1 Creating a Project
13
Creating a New Project
20
Creating an Object
20
Creating a RUN Switch
24
Creating a STOP Switch
27
Creating a Running Lamp
32
Creating a Numerical Display
34
Creating a Figure
34
Creating a Figure (Rectangle)
36
Creating Figures (Text) 1 to 3
39
Creating Figures (Text) 4 and 5
40
Setting the Screen Gesture Function
44
Checking the Created Screen
44
Checking the Display (Screen Preview)
47
Checking Data Errors (Data Check)
48
Checking Operations (Simulator)
52
Saving the Project
53
Step2 Transferring the Project
53
Transferring the Project Data
56
Connecting the Got and Plc
56
Connecting the GOT and the PLC
60
Step3 Using the Got
60
Checking the On/Off Action of Switches
62
Using the Screen Gesture Function
64
Appendix 1 New Functions
64
Utilize Data Function
66
Input Assist Function
67
Help
68
Appendix 2 Function Update
68
Screen Design Software Update
69
Appendix 3 Got Functions
69
List of Got Functions
74
Appendix 4 Relevant Catalogs and Manuals
Mitsubishi Electric GOT2000 Series Quick Start Manual (36 pages)
Graphic Operation Terminal, GOT Mobile
Brand:
Mitsubishi Electric
| Category:
Touch terminals
| Size: 14.76 MB
Table of Contents
2
Safety Precautions
3
Table of Contents
4
Features 4
5
Features of GOT Mobile Function and Examples of Use 4
6
Screens Used with the GOT Mobile Function 6
7
Preparing the Devices
8
Preparing the Devices Required for the GOT Mobile Function
10
Using the GOT Mobile Function
10
STEP2 Setting the GOT Mobile Function
11
Using the GOT Mobile Function 9
13
STEP3 Creating a Mobile Screen
15
STEP4 Setting the GOT Wireless LAN
17
STEP5 Mounting the Wireless LAN Communication Unit Into the GOT
18
STEP6 Transferring Project Data
20
STEP7 Register the GOT Mobile Function License Number in the GOT
21
STEP8 Displaying the Mobile Screen with the Tablet
25
Precautions
26
Appendices
27
Appendix2 Functions, Images and Objects Usable with Mobile Screen
31
Appendix3 Mobile Screen Object Sizes and Layout
33
Appendix4 Differences Between GOT Mobile Function and VNC Server Function
34
Appendix5 List of Related Manuals
Share and save
Advertisement
Related Products
Mitsubishi Electric GOT 2000
Mitsubishi Electric GOT2000-GT27
Mitsubishi Electric GOT2000-GT25
Mitsubishi Electric GOT2000-GT23
Mitsubishi Electric GOT2000-GT21
Mitsubishi Electric GOT2000-Handy GOT
Mitsubishi Electric GOT 1000 Series
Mitsubishi Electric GOT 900
Mitsubishi Electric GOT SIMPLE Series
Mitsubishi Electric GOT Series
Mitsubishi Electric Categories
Air Conditioner
Controller
Projector
Inverter
Monitor
More Mitsubishi Electric Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL