Mitsubishi Electric GOT2000 Series Connection Manual page 347

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(2) Example of sequence program
* Initial processing
Turned on
WDT
at first scan
ERR
only while
detection
running
Initial
WDT ERR
fault
detection
detection
COM.
ERR
turned off
command
* Opening processing of communication line
Initial request
Normal
No. 1
open
completed
initial
completed
POINT
POINT
POINT
When changing the sequence program
After writing the sequence program to the PLC CPU, operate the PLC CPU ether turning OFF
and then ON or resetting.
(3) Communication confirmation
The RDY LED on the Ethernet module turn on when the module is ready to communicate.
For confirming the communication state, refer to the following.
5.4.8 ■4. Confirming the communication state of Ethernet module
The BUF1 LED turns on when the opening processing of the connection No. 1 is completed in normal at executing of
the sequence program example described at (2).
AJ71E71N3-T, AJ71E71N-B5,
A1SJ71E71N3-T, A1SJ71E71N-B5,
AJ71E71N-B2, AJ71E71N-T,
A1SJ71E71N-B2, A1SJ71E71N-T,
AJ71E71N-B5T, AJ71E71-S3
A1SJ71E71N-B5T, A1SJ71E71-B5-S3,
A1SJ71E71-B2-S3
RUN
BUF1
BUF2
RDY
BUF3
BSY
BUF4
SW.ERR.
BUF5
COM.ERR.
BUF6
CPU R/W
BUF7
BUF8
TEST
TEST ERR.
RUN
BUF1
RDY
BUF2
BSY
BUF3
SW.ERR.
BUF4
COM.ERR.
BUF5
TEST
BUF6
TEST ERR.
BUF7
CPU R/W
BUF8
5.4 PLC Side Setting
IP address of Ethernet
module(192.168.3.19)
Initial request
Read the initial fault code.
5
COM. ERR turned off request
Clear the initial fault code.
Set to the permit of
communication while stopping
the PLC CPU.
Communication
format(UDP/IP)
Port No. of Ethernet
module(5001)
IP address of GOT
(When GOT is used, FFFFFFFF
)
H
Port No. of GOT
(When GOT is used, FFFF
)
H
Request to open
5 - 81

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents