Mitsubishi Electric GOT2000 Series Connection Manual page 675

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(2) CC-Link Utility's [Parameter Settings]
(a)
Parameter settings
Number of modules
Target module
Start I/O No.
Channel No.
Type
Mode
Expanded cyclic setting
Operation
Occupied number
settings
Error event: input data status
CPU stop: data link status
Other settings
All connect count
Station Type
Station
information
Occupied number
settings
Reserve/invalid station select
Intelligent buffer select (word)
*1
When the [Mode] of the CC-Link module is set at [Remote net - (Ver. 1 mode)], [Remote station points] cannot be set.
*2
Set the same number of occupied stations as that on the GOT.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the C Controller module (Q Series), either turn the C
Controller module (Q Series) OFF and then ON or reset it.
*1
Item
Sta.No.1
*2
Sta.No.1
Sta.No.1
Set value
1
1
0000H
(Use default value)
Master station (fixed)
Remote net
(Ver.1 mode)
Single
Exclusive station 1
Clear
Refresh
(Use default value)
1
Intelligent device station
Exclusive station 1
No setting
(Use default value)
: Necessary
: As necessary
12.4 PLC Side Setting
Setting necessity at GOT
connection
12
: Not necessary
12 - 33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents