Mitsubishi Electric GOT2000 Series Connection Manual page 309

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■3. [Controller Setting] and [Ethernet] of GT Designer3
(1) Controller setting
GOT NET No.
GOT PLC No.
GOT Standard Ethernet Setting
GOT Port No.
(Communication)
Retry
Startup Time
Timeout Time
Delay Time
(2) GOT Standard Ethernet Setting
GOT IP Address
Subnet Mask
Default Gateway
Peripheral Communication Port No.
Transparent Port No.
(3) Ethernet setting
Ethernet setting No.1
*1
The following [Port No.] and [Communication format] can also be set.
[Port No.]: 5002
[Communication]: TCP
Item
Item
Item
Host
N/W No.
PLC No.
Type
IP Address
*1
Port No.
*1
Communication
Set value (Use default value)
1
1
192.168.3.18
5002
3times
3sec
3sec
0ms
Set value (Use default value)
192.168.3.18
255.255.255.0
0.0.0.0
5015
5014
Set value
*
1
2
RJ71EN71
192.168.3.19
5001
UDP
5.4 PLC Side Setting
5
5 - 43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents