■2. 1:n connection of GOT and redundant system
(1) System configuration example
The following connection configuration examples are explained.
Control system
(system A)
N/W No.: 1
PC No.: 1
N/W No.: 1
GOT
PC No.: 5
(2) Connection method
Connect the Ethernet network system to the GOT.
10. CC-Link IE CONTROLLER NETWORK CONNECTION
(3) PLC Side Setting
4.1.3 ■1. (3) PLC Side Setting (GX Works3)
(4) GOT Side Settings
Set GT Designer3 as follows.
Setting item
Controller Type
Device setting (Network setting)
MELSEC Redundant Setting
1) 2) 5)
4)
Optical cable
1)
2) 5)
Control system
(system A)
N/W No.: 1
PC No.: 3
1) Process CPU
2) Redundant function module
3) Tracking cable
4) CC-Link IE Controller Network module
5) CC-Link IE Filed Network Master/Local module
MELSEC iQ-R, RnMT/NC
Host
NW No.: 1
Other
Station No.: Station number of the control system
The system (control system/standby system) of the the monitor target can
be speified.
Control system/
Only when checking [Enable Redundant Function] in the following
standby system
[MELSEC Redundant System Setting], [Control System/Standby System]
can be set.
4.3 MELSEC Redundant Setting
(Redundant system-1: Pair No.1)
1)
2)
5)
4)
3)
1)
2) 5)
4)
3)
Contents of setting
-
4.1 MELSEC iQ-R Series
Standby system
(system B)
N/W No.: 1
PC No.: 2
(Redundant system-2: Pair No.2)
(Redundant system-2: Pair No.2)
Standby system
(system B)
N/W No.: 1
PC No.: 4
4)