Mitsubishi Electric GOT2000 Series Connection Manual page 688

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(2) CC-Link Utility's [Parameter Settings]
(a)
Parameter settings
Number of modules
Target module
Start I/O No.
Channel No.
Operation
settings
Station
information
settings
*1
*2
12 - 46
12.4 PLC Side Setting
*1
Item
Type
Mode
Expanded cyclic setting
Occupied number
Error event: input data status
CPU stop: data link status
Other settings
All connect count
Station Type
*2
Expanded cyclic setting
*2
Occupied number
Remote station points
Reserve/invalid station select
Intelligent buffer select (word)
When the [Mode] of the CC-Link module is set at [Remote net - (Ver. 2 mode)], [Remote station points] can be set.
[Remote station points] is a setting for the remote I/O station.
The default value (32 points) must be used on the GOT.
Set the same setting as that of the GOT.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the C Controller module (Q Series), either turn the C
Controller module (Q Series) OFF and then ON or reset it
Set value
0000H
(Use default value)
Master station
Remote net (Ver.2 mode)
Single
Exclusive station 1
Refresh
(Use default value)
Sta. No.1
Ver.1 intelligent device station
Sta. No.2
Ver.2 intelligent device station
Sta. No.1
Single
Sta. No.2
Single
Sta. No.1
Exclusive station 1
Sta. No.2
Exclusive station 1
Sta. No.1
32 points
Sta. No.2
32 points
Sta. No.1
No setting
Sta. No.2
No setting
(Use default value)
: Necessary
Setting necessity at GOT
1
1
Clear
2
: As necessary
connection
: Not necessary

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents