Mitsubishi Electric GOT2000 Series Connection Manual page 308

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Relay station No.
(4) Communication confirmation
The INIT. LED on the Ethernet module turns on when the module is ready to communicate.
For confirming the communication state, refer to the following.
5 - 42
5.4 PLC Side Setting
Item
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the request source GOT.
For the setting, refer to the following.
5.3.5 Routing parameter setting
■3. [Controller Setting] and [Ethernet] of GT Designer3
RJ71EN71
RUN
INIT.
OPEN
0 to 120
ERR.
COM.ERR.
100M
SD
RD
Range

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents