Mitsubishi Electric GOT2000 Series Connection Manual page 75

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

1
■2. Confirming the communication state on the GOT
[PING Test] can be confirmed by the Utility screen of the GOT.
For details on the operation method of the GOT Utility screen, refer to the following manual.
GOT2000 Series User's Manual (Utility)
1 - 45
1.6 Checking for Normal Monitoring

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents