Mitsubishi Electric GOT2000 Series Connection Manual page 340

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(1) Operation mode setting switch
Operation mode setting
(2) Exchange condition setting switch
Exchange condition setting
switch
OFF
SW1
SW2
SW3
SW4
SW5
SW6
SW7
SW8
*1
*2
5 - 74
5.4 PLC Side Setting
switch
Setting
switch
SW1
ON
SW2
SW3
SW4
SW5
SW6
SW7
SW8
Because port No. 5001 is fixed, these items operate at the following setting without relations to the setting given here.
• Data code setting: [Binary code]
• Enable Write at RUN time: [Enable Write at RUN time] (Writing Data is applicable while running the PLC CPU.)
When SW3 is ON, the initial processing is executed regardless of the initial request signal (Y19).
In addition, communication is applicable while stopping the PLC CPU.
For the initial processing by using the initial request signal (Y19), refer to the following manual.
For QnA Ethernet Interface Module User's Manual
POINT
POINT
POINT
When the switch setting has been changed
Turn the PLC CPU OFF then ON again, or reset the PLC CPU.
Description
Online
: Necessary
Description
Selection of line processing at TCP
timeout error
Data code
*1
setting
*2
Self start mode setting
(Must not to be used)
*1
CPU exchange timing setting
Initial timing setting
: Necessary
Setting necessity at GOT
Set value
connection
0
(fixed)
: As necessary
: Not necessary
Setting necessity at GOT
Set value
connection
OFF
OFF
(fixed)
ON
OFF
(fixed)
OFF
(fixed)
OFF
: As necessary
: Not necessary

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents