Cc-Link (Id) Connection - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

17.7.3

CC-Link (ID) connection

■1. Using cyclic transmission
(1) I/O signal for master station
Do not turn on the reserved output signals in the output signals (remote output: RY) to the GOT from the master
station.
When the reserved output signal is turned on, the CNC system may be malfunctioned.
For the assignment of I/O signals in the GOT, refer to the following manual.
MODEL GT15-J61BT13 CC-Link communication unit User's Manual
GT15 CC-Link communication unit User's Manual
(2) CC-Link Mode
It's different in the correspondence version of CC-Link depending on the models of CNC.
MELDAS C6/C64: Ver.1 only correspondence
M700VS/M70V: Ver.2, Ver.1 correspondence
(3) When GOT malfunctions
The cyclic output status remains the same as before becoming faulty.
■2. For transient transmission
(1) Access range that can be monitored
The GOT can access to the CNC mounting the master and local station of the CC-Link System.
It cannot access another network via the CC-Link module.
■3. GOT startup in CNC connection (CC-Link connection (intelligent device station))
In the CNC connection (CC-Link connection (intelligent device station)), the data link is started approximately 10
seconds after the GOT startup.
■4. When a network error occurs in the system alarm
In the CNC connection (CC-Link connection (intelligent device station)), when a network error occurs in the system
alarm, the system alarm message cannot be canceled even though the causes are removed.
To cancel the system alarm display, restart the GOT.
■5. Version of CNC
For MELDAS C6/C64, use NC system software version D0 or later.
17 - 25
17.7 Precautions
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents