Mitsubishi Electric GOT2000 Series Connection Manual page 607

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(c)
Routing parameter setting
Up to 64 [Transfer Network No.]s can be set.
However, the same transfer network number cannot be set twice or more (multiple times).
Therefore, the one that can access to other station from the request source host GOT is 64 kinds of [Transfer
Network No.]s.
Target network No.
Relay network No.
Relay station No.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the request source GOT.
For the setting, refer to the following.
Item
10.3.3 Routing parameter setting
Range
1 to 239
1 to 239
0 to 120
10.4 PLC Side Setting
10
10 - 29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents