Mitsubishi Electric GOT2000 Series Connection Manual page 595

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(c)
Routing setting
Up to 238 [Target Station Network No.]s can be set.
However, the same target station network number cannot be set twice or more (multiple times).
Therefore, the one that can access to other station from the request source host GOT is 238 kinds of [Target
Station Network No.]s.
Target Station network No.
Relay Station network No.
Relay station No.
■4. GT Designer3 [Communication settings] on System configuration1 (Network Type: CC IE
Control)
Network Type
Network No.
Station No.
Group No.
Mode Setting
Transmission Speed
Refresh Interval
Retry
Timeout Time
Delay Time
Monitor Speed
Item
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the request source GOT.
For the setting, refer to the following.
10.3.3 Routing parameter setting
Item
POINT
POINT
POINT
[Controller Setting] of GT Designer3
For the setting method of [Controller Setting] of GT Designer3, refer to the following.
10.3.1 Setting communication interface (Controller Setting)
Range
1 to 239
1 to 239
0 to 120
Set value
CC IE Control
1: Network No.1
2: Station No.2
0 (fixed)
Online (auto. reconnection)
1Gbps (fixed)
1ms (Use default value)
3times (Use default value)
3sec (Use default value)
0ms (Use default value)
High (Normal) (Use default value)
10.4 PLC Side Setting
10
10 - 17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents