■3. CC-Link connection (intelligent device station) (Connection to the CC-Link module
mounted on redundant type extension base unit)
This section explains the CC-Link connection for connecting the GOT to the CC-Link module mounted on the
redundant type extension base unit.
The following shows an example of connecting the GOT to the CC-Link module mounted on the redundant type
extension base unit.
Monitor target
Control system
(System A)
Redundant type extension base unit
Network No. 0, Station No. 0
(Master station)
(1) Connection method
Connect the GOT to the CC-Link module (QJ61BT11N) mounted on the redundant type extension base unit.
For details, refer to the following.
12. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
(2) GT Designer3 setting
Set GT Designer3 as follows.
Setting item
Controller Type
Device setting (Network setting)
MELSEC Redundant Setting
In this case, the GOT monitoring is performed by transient transmission of the CC-Link network system. Therefore, a
longer time-lag occurs for displaying objects compared with directly monitoring the PLC CPU.
For displaying objects with a shorter time-lag, set the device for RX, RY, RWw, RWr of the host station set in the CC-
Link network and execute the cyclic transmission.
For details, refer to the following.
3.3 CC-Link System Access Range for Monitoring
(3) Monitoring target change when system switching occurs in a redundant system
When the system switching occurs, the GOT automatically changes the monitoring target to the PLC CPU switched
to the control system.
MELSEC-QnA, MELDAS C6*
NW No.: 0 (fixed)
Other
Station No.: 0 (Master station)
Do not set the item.
Standby system
(System B)
CC-Link connection
Network No. 0, Station No. 1
GOT
Settings
4.2 MELSEC Q Series
4
Model
4 - 73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents