Mitsubishi Electric GOT2000 Series Connection Manual page 724

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■6. Connection to LCPU
LCPU may diagnose (check file system, execute recovering process, etc.) the SD memory card when turning on the
power or when resetting. Therefore, it takes time until the SD memory card becomes available. When the GOT starts
before the SD card becomes available, a system alarm occurs. Adjust the opening screen time in the GOT setup so
that no system alarm occurs.
■7. Connection to Q17nDCPU, Q170MCPU, Q170MSCPU(-S1), CNC C70, or CRnQ-700
The Q17nDCPU, Q170MCPU, Q170MSCPU(-S1), CNC C70, and CRnQ-700 are applicable to CC-Link Ver.2 only.
For connecting to the CC-Link (ID) network system, set the CC-Link (ID) network system to the CC-Link Ver.2 mode.
■8. Connection to Q170MCPU or Q170MSCPU(-S1)
Set [CPU No.] to "2" in the device setting to monitor the device of the Motion CPU area (CPU No.2).
When the CPU No. is set to "0" or "1", the device on the PLC CPU area (CPU No.1) is monitored.
When the CPU No. is set to the number other than "0" to "2", a communication error occurs and the monitoring cannot
be executed.
For setting the CPU No., refer to the following manual.
Example) Setting dialog box of the bit device
■9. Connection to RnSFCPU
The RnSFCPU takes 10 seconds or more to run.
If the GOT is started before the RnSFCPU runs, a system alarm occurs.
To prevent a system alarm from occurring, adjust the title display time in the [GOT Setup] dialog.
■10. Connecting one PLC with multiple GOT units
When multiple GOT units are simultaneously accessing one PLC, the GOT writing process (transient/cyclic) and
reading process (transient) may slow down.
This slow access can be remedied with the following countermeasures.
<Countermeasures>
(1) Improve response speed on PLC side
Insert a COM instruction on the PLC to increase the response speed. Note that caution is required as the scan time
will increase.
(2) Screen design using cyclic devices
Create the screen with cyclic devices instead of using transient devices.
(3) Split GOT connection destinations into several systems
Add a master/local unit on the PLC side, and split the GOT connection destinations into several systems.
Improve the current system configuration.
(Example of current system configuration)
With the following system configuration, access from the GOT is concentrated at one unit.
12 - 82
12.5 Precautions
GT Designer3 (GOT2000) Screen Design Manual
GT Designer3 (GOT2000) Screen Design Manual
GT Designer3 (GOT2000) Screen Design Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents