Mitsubishi Electric GOT2000 Series Connection Manual page 793

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■9. Connecting FREQROL-F700PJ series
Make the communication settings of the inverter.
Be sure to perform the inverter reset after updating each parameter.
(1) Communication port and corresponding parameters
GOT connection destination
PU connector
(2) Communication settings of inverter
Set the following parameters using the PU (parameter unit). Before setting the parameters, set Pr.160 (Extended
function display selection) to 0 so that simple mode + extended mode parameters are displayed.
Do not change these parameters, even though they can be monitored from the GOT. If they are changed,
communication with the GOT is disabled.
Setting item
PU communication station number
PU communication speed
PU communication stop bit length
PU communication parity check
Number of PU communication retries
PU communication check time interval
PU communication waiting time setting
PU communication CR/LF selection
Protocol selection
Operation mode selection
Communication startup mode selection
Communication EEPROM write selection
*1
Setting items are parameter names described in the manual of FREQROL-F700 series.
*2
Settings on the GOT can be changed.
When changing the settings on the GOT, be sure to change the parameters on the inverter to correspond with the GOT settings.
*3
Inverter default values (No need to change)
*1
*2
*2
POINT
POINT
POINT
Automatic setting with Pr.999
If Pr.999 is set as the following, the communication settings other than [PU communication
station number] and [Communication EEPROM write selection] can be automatically set in a
batch to the default communication settings of the GOT side.
Parameter No.
Set value
*1
10
Pr.999
*1
When monitoring the value of Pr.999, 9999 is always monitored.
Parameters corresponding to inverter
Pr.79, Pr.117 to Pr.124, Pr.340, Pr.342, Pr.549
Parameter No.
Set value
Pr.117
0 to 31
Pr.118
192
Pr.119
10
Pr.120
1
Pr.121
9999
Pr.122
9999
Pr.123
0
*3
Pr.124
1
*3
Pr.549
0
*3
Pr.79
0
Pr.340
1
*3
Pr.342
0
Description
GOT Initial settings (PU connector)
14.2 System Configuration
Contents of setting
14.2.9 Station number setting
*3
19200bps
Data length: 7bit
Stop bit length: 1bit
Odd
The inverter will not come to an
alarm stop.
Communication check suspension
0ms
With CR, without LF
Mitsubishi Electric inverter protocol
External operation mode at power
on
Network operation mode.
Written to RAM and EEPROM
Operation in parameter setting mode
[AUTO]
[GOT]
[1]Write
14
14 - 37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents