Mitsubishi Electric GOT2000 Series Connection Manual page 345

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(2) Exchange condition setting switch
Exchange condition setting
switch
OFF
ON
SW1
SW2
SW3
SW4
SW5
SW6
SW7
SW8
*1
The exchange condition setting switches of A1SJ71E71-B5-S3 and A1SJ71E71-B2-S3 are specified as the below.
■3. Sequence program
The sequence program for initial processing and communication line opening processing are required.
(1) Programming condition
This program performs the initial processing of the Ethernet module and the opening processing of connection No. 1
when the stopping PLC CPU starts running.
(a)
I/O signal of Ethernet module
For A Ethernet Interface Module User's Manual
(b)
Device used by user
D112 to D113
*1
Setting
switch
Selection of line processing at TCP
SW1
timeout error
Data code setting
SW2
(binary code)
SW3
SW4
(Must not to be used)
SW5
SW6
CPU exchange timing setting
SW7
(Enable write at RUN time)
SW8
Initial timing setting
Exchange condition
Setting
setting switch
switch
SW1
ON
OFF
SW2
SW1
SW2
SW3
SW4
SW3
SW4
POINT
POINT
POINT
When the switch setting has been changed
Turn the PLC CPU OFF then ON again, or reset the PLC CPU.
Device
M102
COM.ERR turned off command
D100
IP address of Ethernet module
D110
Application setting
D111
Port No. of Ethernet module
IP address of GOT
D114
Port No. of GOT
D200
Initial fault code
Description
Set value
OFF
OFF
(fixed)
OFF
(fixed)
ON
(fixed)
OFF
: Necessary
: As necessary
Description
Selection of line processing at
TCP timeout error
Data code setting
(binary code)
CPU exchange timing setting
(Enable write at RUN time)
Initial timing setting
: Necessary
: As necessary
Application
5.4 PLC Side Setting
Setting necessity at GOT
connection
: Not necessary
Setting necessity at
Set value
GOT connection
OFF
OFF
(fixed)
ON
(fixed)
OFF
: Not necessary
5 - 79
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents