Connection To Cc-Link Ie Controller Network - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

4.1.3

Connection to CC-Link IE Controller Network

■1. One-to-one connection of GOT and redundant system
(1) System configuration example
The following connection configuration examples are explained.
Control system (system A)
N/W No.: 1
PC No.: 1
(2) Connection method
Connect the CC-Link IE Controller Network system to the GOT.
10. CC-Link IE CONTROLLER NETWORK CONNECTION
(3) PLC Side Setting (GX Works3)
(a)
Control system (system A) PLC setting
• Module parameter
Station type
Network No.
Station number setting
Network range assignment
• Network range assignment
Pairing
GOT
1)
2) 5)
4)
1) Process CPU
2) Redundant function module
3) Tracking cable
4) CC-Link IE Controller Network module
5) CC-Link IE Filed Network Master/Local module
Item
Item
N/W No.: 1
PC No.: 3
Optical cable
(Redundant system: Pair No.1)
1)
2) 5)
4)
3)
Set value
Control station (fixed)
1
1
Refer to hereinafter
Set value
To pair
4.1 MELSEC iQ-R Series
Standby system (system B)
N/W No.: 1
PC No.: 2
4
4 - 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents