Mitsubishi Electric GOT2000 Series Connection Manual page 357

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(3) Ethernet setting
Ethernet setting No.1
*1
Set the value according to the IP address of the connected PLC.
*2
Set the value according to the Port No. of the connected PLC.
For details, refer to the following.
■4. Confirming the communication state of Ethernet module
(1) When using the Command Prompt of Windows.
Execute a Ping command at the Command Prompt of Windows.
(a)
When normal communication
C:\>Ping 192.168.3.19
Reply from 192.168.3.19: bytes=32 time<1ms TTL=64
(b)
When abnormal communication
C:\>Ping 192.168.3.19
Request timed out.
(2) When abnormal communication
At abnormal communication, check the followings and execute the Ping command again.
• Mounting condition of Ethernet communication unit
• Cable connecting condition
• Confirmation of switch and network parameter setting
• Operation state of PLC CPU (faulty or not)
• IP address of GOT specified by Ping command
Item
Host
N/W No.
PLC No.
Type
IP address
Port No.
Communication
5.3.4 Ethernet setting
POINT
POINT
POINT
[Controller Setting] and [Ethernet] of GT Designer3
For [Controller Setting] and [Ethernet] of GT Designer3, refer to the following.
5.3.1 Setting communication interface (Controller Setting)
Setting
*
1
2
FX (fixed)
*1
192.168.0.19
*2
5556
TCP (fixed)
5.4 PLC Side Setting
5
5 - 91

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents