Items To Be Checked Before Starting Drawing - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

21.3.6

Items to be checked before starting drawing

The following describes that should be understood before starting drawing and the functions that should be set beforehand
when using the multi-channel function.
■1. Device settings
It is necessary to set the device to be used together with the CH No.
Click the device setting button.
■2. Accessible range for monitoring
The accessible range for monitoring is not changed even when the multi-channel function is used.
21 - 24
21.3 GOT Side Settings
GT Designer3 (GOT2000) Screen Design Manual
Click the controller to be set.
3. ACCESS RANGE FOR MONITORING
FXCPU
Set the device.
FXCPU
Accessible range
is not changed.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents