Mitsubishi Electric GOT2000 Series Connection Manual page 681

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(2) CC-Link Utility's [Parameter Settings]
(a)
Parameter settings
Number of modules
Target module
Start I/O No.
Channel No.
Type
Mode
Expanded cyclic setting
Operation
Occupied number
settings
Error event: input data status
CPU stop: data link status
Other settings
All connect count
Station Type
Expanded cyclic setting
Station
information
Occupied number
settings
Remote station points
Reserve/invalid station select
Intelligent buffer select (word)
*1
When the [Mode] of the CC-Link module is set at [Remote net - (Ver. 2 mode)], [Remote station points] can be set.
[Remote station points] is a setting for the remote I/O station.
The default value (32 points) must be used on the GOT.
*2
Set the same setting as that of the GOT.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the C Controller module (Q Series), either turn the C
Controller module (Q Series) OFF and then ON or reset it.
*1
Item
Sta. No.1
*2
Sta. No.1
*2
Sta. No.1
Sta. No.1
Sta. No.1
Set value
1
1
0000H
(Use default value)
Master station
Remote net
(Ver.2 mode)
Single
Exclusive station 1
Clear
Refresh
(Use default value)
1
Ver.2 intelligent device station
Single
Exclusive station 1
32 points
No setting
(Use default value)
: Necessary
: As necessary
12.4 PLC Side Setting
Setting necessity at GOT
connection
12
: Not necessary
12 - 39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents