Mitsubishi Electric GOT2000 Series Connection Manual page 250

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■4. CC-Link connection (Via G4) (Connection to the CC-Link module mounted on redundant
type extension base unit)
This section explains the CC-Link connection (Via G4) for connecting the GOT to the CC-Link module mounted on the
redundant type extension base unit via the AJ65BT-G4-S3.
The following shows an example of connecting the GOT to the AJ65BT-G4-S3 of the CC-Link network.
Control system
(System A)
Redundant type extension base unit
Network No. 0, Station No. 1
(AJ65BT-G4-S3)
(1) Connection method
Connect the AJ65BT-G4-S3 of the CC-Link network to the GOT.
For details, refer to the following.
(2) GT Designer3 setting
Set GT Designer3 as follows.
Setting item
Controller Type
Device setting (Network setting)
MELSEC Redundant Setting
(3) Monitoring target change when system switching occurs in a redundant system
When the system switching occurs, the GOT automatically changes the monitoring target to the PLC CPU switched
to the control system.
4 - 74
4.2 MELSEC Q Series
Monitor target
13. CC-Link CONNECTION (Via G4)
MELSEC-QnA, MELDAS C6*
Host
Do not set the item.
Standby system
(System B)
Network No. 0, Station No. 0
(Master station)
CC-Link
connection
GOT
Settings
Model

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents