Mitsubishi Electric GOT2000 Series Connection Manual page 565

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(2) Network range assignment
Monitoring time
Send range
for
each station
(LB)
*1
BW setting
Send range
for
each station
(LW)
*1
XY setting
*1
Specify I/O master station
Specify reserved station
Supplementary setting
Station inherent parameters
*1
Be sure to set it to perform the cyclic transmission.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the PLC CPU, operate the PLC CPU ether turning OFF
and then ON or resetting.
Item
Start
Station No.1
End
Start
Station No.2
End
Start
Station No.1
End
Start
Station No.2
End
9.5 PLC side setting when connecting to MELSEC/10
Setting necessity at GOT
Set value
200
0000H
00FFH
0100H
01FFH
0000H
00FFH
0100H
01FFH
No setting
No setting
No setting
(Use default value)
: Necessary
: As necessary
connection
9
: Not necessary
9 - 41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents