Mitsubishi Electric GOT2000 Series Connection Manual page 597

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(c)
Routing setting
Up to 238 [Target Station Network No.]s can be set.
However, the same target station network number cannot be set twice or more (multiple times).
Therefore, the one that can access to other station from the request source host GOT is 238 kinds of [Target
Station Network No.]s.
Target Station network No.
Relay Station network No.
Relay station No.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the request source GOT.
For the setting, refer to the following.
(2) [Controller Setting] of GT Designer3
Network type
Network No.
Station No.
Group No.
Mode
Refresh Interval
Retry
Timeout Time
Delay Time
Monitor Speed
POINT
POINT
POINT
Network type of the GOT side
When the network is in the extended mode, be sure to set the network type of the GOT side to
[CC IE Control extended mode].
For [Controller Setting], of GT Designer3, refer to the following.
Item
10.3.3 Routing parameter setting
Item
10.3.1 Setting communication interface (Controller Setting)
Range
1 to 239
1 to 239
0 to 120
Set value
CC IE Control extended mode
1: Network No.1
2: Station No.2
0 (fixed)
Online (auto. reconnection)
1ms (Use default value)
3times (Use default value)
3sec (Use default value)
0ms (Use default value)
High (Normal) (Use default value)
10.4 PLC Side Setting
10
10 - 19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents