Toyota T100 1996 Service Manual page 1391

1996 toyota t100
Table of Contents

Advertisement

Control Select
Control Shaft
Shaft
Support Sub−Assembly
Casing Cap
1996 TOYOTA T100 (RM449U)
AUTOMATIC TRANSMISSION
REASSEMBLY
1.
(a)
(b)
D10995
2.
(a)
(b)
Q06989
3.
(a)
(b)
(c)
Q02711
4.
Spring
(a)
Casing
Cap
(b)
Q02708
(c)
Q02712
SHIFT LOCK SYSTEM
INSTALL CONTROL SHAFT SUPPORT
Install the bushings, control shaft support sub−assembly
and plate washer.
Using a snap ring expander, install the snap ring.
INSTALL SHIFT LEVER SUB−ASSEMBLY, CONTROL
SELECT SHAFT AND SPRING
Insert the spring and control select shaft.
Install the shift lever sub−assembly with the bolt and nut.
Torque: 19 N·m (195 kgf·cm, 14 ft·lbf)
INSTALL SHIFT LEVER PLATE SUB−ASSEMBLY
Install the shift lever plate sub−assembly.
Align the hole of the shift lever plate assembly and hole
of the control select shaft.
Using a pin punch, tap in the slotted spring pin.
INSTALL PARKING LOCK CABLE ASSEMBLY
Apply MP grease to the inside sliding surface of the con-
trol shaft support sub−assembly.
Install the parking lock cable assembly to the control shaft
support sub−assembly, as shown.
Tighten the casing cap.
Torque: 50 N·m (510 kgf·cm, 37 ft·lbf)
AT−23
AT028−02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents