Toyota T100 1996 Service Manual page 1694

1996 toyota t100
Table of Contents

Advertisement

SST
A
SST
1996 TOYOTA T100 (RM449U)
BRAKE
LOAD SENSING PROPORTIONING AND BY−PASS
VALVE (LSP & BV)
INSTALLATION
1.
INSTALL LSP & BV ASSEMBLY TO FRAME
Torque: 29 N·m (300 kgf·cm, 22 ft·lbf)
2.
CONNECT BRAKE LINE
Using SST, connect the brake lines.
Torque: 15 N·m (155 kgf·cm, 11 ft·lbf)
SST
Z11332
3.
CONNECT SHACKLE NO.2 BRACKET
(a)
Install the shackle No.2 to the load sensing spring.
(b)
Set dimension A and torque the lock nut.
Initial set: 120 mm (4.72 in.)
Torque: 25 N·m (250 kgf·cm, 18 ft·lbf)
(c)
Connect the shackle No.2 to the shackle bracket.
Torque: 13 N·m (130 kgf·cm, 9 ft·lbf)
(d)
Install a new cotter pin.
Z11333
4.
SET REAR AXLE LOAD
(See page BR−50)
5.
SET VALVE BODY
(a)
When pulling down the load sensing spring, check that
the valve piston moves down smoothly.
(b)
Position the valve body so that the valve piston lightly
contacts with the load sensing spring.
(c)
Tighten the valve body mounting nuts.
Torque: 13 N·m (130 kgf·cm, 9 ft·lbf)
BR0218
6.
BLEED BRAKE LINE (See page BR−4)
7.
CHECK AND ADJUST LSP & BV FLUID PRESSURE
(See page BR−50)
8.
APPLY SEALANT TO SHACKLE No.2
Apply sealant to the top portion of the shackle No.2 bolt threads
not to lose the upper lock nut.
Sealant:
Part No. 08833−00070, THREE BOND 1324 or equiva-
lent
BR0061
09751−36011
BR−57
BR09X−01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents