BRP Cam-am Outlander 6x6 DPS 2015 Manual page 50

Table of Contents

Advertisement

Section 02 ENGINE, CVT AND GEARBOX
Subsection 01 (ENGINE REMOVAL AND INSTALLATION)
PROCEDURES
ENGINE REMOVAL
1. Place vehicle on a workstation equipped with
an engine-lifting hoist.
2. Set transmission to park "P" and engage parking
brake.
3. Carry out the following operations. Refer to ta-
ble.
OPERATIONS
Release fuel pressure
Remove battery from
vehicle
Drain engine coolant
Remove front body module
Remove RH footrest panel
Remove air filter housing
Remove muffler
Remove exhaust pipes
Remove CVT air inlet
adapter
Remove CVT air outlet
adapter
Disconnect starter cable
Disconnect TPS and
IACV connectors from
throttle body
Disconnect MAPTS
connector from intake
manifold
Remove intake manifold
Remove spark plug cables
4. Remove RH footrest support.
70
REFERENCES
(SUBSECTION)
FUEL TANK AND
FUEL PUMP
CHARGING SYSTEM
PERIODIC
MAINTENANCE
PROCEDURES
BODY
AIR INTAKE SYSTEM
EXHAUST SYSTEM
CONTINUOUSLY
VARIABLE
TRANSMISSION (CVT)
STARTING SYSTEM
ELECTRONIC FUEL
INJECTION (EFI)
INTAKE MANIFOLD
IGNITION SYSTEM
vmr2012-009-003_a
1. RH footrest support
5. Move throttle body aside to make room.
vmr2012-009-001
TYPICAL - THROTTLE BODY SECURED TO FRAME
6. Move the master cylinder backwards.
vmr2015-012-003_a
Step 1: Remove these fasteners
Step 2: Move master cylinder assembly back
vmr2015-025

Advertisement

Table of Contents
loading

Table of Contents