Required Tools - BRP Cam-am Outlander 6x6 DPS 2015 Manual

Table of Contents

Advertisement

Section 02 ENGINE, CVT AND GEARBOX
Subsection 13 (BOTTOM END (650))
R1004motr20A
1. Half plain bearing of connecting rod big end
2. Mating surface of the connecting rod
3. Joining surface of plain bearing in line with connecting rod
groove
Oil the plain bearing surface of the connecting rod
and crankshaft pin before installation.
NOTICE
Lower cap and rod must match to-
gether since there is a cracked surface.
Oil NEW connecting rod screws.
Thread screws in the connecting rods, then
tighten as per following procedure.
NOTICE
Strictly adhere following instruc-
tions:
– Always use NEW connecting rod screws at fi-
nal assembly. They are not reusable.
– Do not apply any thread locker.
– The running direction of the big end bearings
and of the piston pins must not change.
– Always perform each step on both connecting
rod screws before going to the next step.
– Failure to strictly follow procedure may cause
connecting rod screws to loosen and lead to se-
vere engine damage.

REQUIRED TOOLS

Torque wrench
Angle torque wrench
246
1
3
2
vmr2006-044-043_a
1. Angle torque wrench
NEW connecting rods can be installed either way.
STEP 1
STEP 2
STEP 3
Crankshaft Installation
For installation of crankshaft in crankcase reverse
the removal procedure. However, pay attention to
the following details.
Do not interchange the connecting rods of pistons
1 and 2 during installation.
NOTICE
sition when fitting the crankshaft with the
connecting rods. The connecting rod MAG
side has to face cylinder no. 1.
CONNECTING ROD SCREW TIGHTENING
SEQUENCE
Tighten to 1/2 of specified torque
Tighten to 20 N•m ± 2 N•m
(15 lbf•ft ± 1 lbf•ft)
Torque an additional 60 ± 5° turn
using an angle torque wrench
Observe the correct installation po-
vmr2015-120

Advertisement

Table of Contents
loading

Table of Contents