Mitsubishi Electric GOT2000 Series Connection Manual page 1119

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(2) Connecting the GOT and PLC in direct CPU connection(for FX5U/FX5UC only)
Step 1.
Click [Online]
Step 2.
The [Specify Connection Destination 1] is displayed.
Step 3.
Set the [Specify Connection Destination 1]:
PC side I/F: Serial USB
PLC side I/F: GOT
Other Station Setting: No Specification:
Step 4.
Double-click [Serial USB] of the PC side I/F to display [PC side I/F Serial Setting].
Step 5.
Select [USB] in the [PC side I/F Serial Setting] dialog.
Step 6.
Double-click [GOT] of the PLC side I/F to display [PLC side I/F Detailed Setting of GOT].
[Specify Connection Destination] on GX Works3.
22.7 Personal Computer Side Setting
22
22 - 63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents